Materials and resources Flashcards

1
Q

MR Prerequisite - Storage and Collection of recyclables

A

Project must provide dedicated recyclable material collection and storage for mixed paper, corrugated cardboard, glass, plastic and metals

In addition safe collection and disposal of two of the following batteries, mercury contain lamps, electronic waste

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

MR Prerequisite - Construction and Demolition Waste Management Planning

A

Contractor must implement CWM plan
including recylcing center locations and whether materials are separated or comingled
Must included diversion goals for at least 5 materials
Hazardous waste and land clearing debris does not count.
ACD doesnt count for diversion but does for total

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

MR - Credit Construction and Demolition Waste Management

A

Option 1 - Diversion
Musts choose between following
Path 1 - Divert 50% and 3 material streams (1pt)
Path 2 - Divert 75% and 4 material streams (2pt)
Option 2 - Reduction of Total Waste Material
amount of waste cannot exceed 2.5 lb/ft2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

MR Prerequisite - PBT Source Reduction - Mercury (Healthcare only)

A

Team must identify types of mercery containin products and devices
how they will be recyled
and identify disposal method for captured mercury

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

MR Credit - PBT Source Reduction - Lead, Cadium, and Copper (Healthcare Only)

A

-Lead
Water for human consumption solder and flux that meets California AB1953
-Cadium
no use of interior or exterior paints containing cadium
-copper
joints must be mechanically cripped or specify that all solder joints comply with ASTM B828-2002 and ASTM B813-2010

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

MR Credit - Building Life Cycle Impact Reduction

A

-Option 1 - Historic Building Reuse (5 points)
Project must reuse part of historic building registered local, state, or nationally, no minimum. Cant be demolitioned. Additions and alteration must be local review or by preservation professional
-Option 2 - Renovation of Abandoned or Blighted Building (5 points)
At least 50% of building must be maintained by surface area
Areas that are unsafe or unsound can be demolished.
25% of buildings surface area can be excluded
-Option 3 - Building and Material Reuse (2-4pts)
utilize onsite or offsite reused or salvaged building materials. (includes permanently installed materials, structural elements, enclosure materials. Windows and hazardous materials are excluded)
25% = 2pts BD+C 2pts CS
50% = 3pts BD+C 3pts CS
75% = 4ts BD+C 5pts CS
-Option 4 - Whole building Life Cycle Assessment
cradle to grave LCA for project structure and enclosure must show min 10% reduction in at least 3 of 6 categories
1. Global Warning Potential
2. Depletion of the Stratospheric ozone Layer
3. Acidifiction of land and water sources
4. eutrophication
5. formation of tropospheric ozone
6. depletion of nonrenewable energy resources

Healthcare only materials demolished to create courtyards to increase daylighting maybe retained in calculations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

MR Credit - Building Product Disclosure and Optimization - Environmental Product Declarations

A

Team can do 1 or both for a max 2 pts
-Option 1 - Environmental Product Declaration (EPD)
at least 20 different permanently installed from at least 5 different manufacturers. must be one of 4 types
Product Specific, Industry wide, Product specific type 3 or a USGBC approved program.
-Option 2 - Multi-attribute Optimization
50% (by cost) of permanently installed comply with one of the following
*3rd party certified to impact reduction in at least 3 categories (valued at least 100%)
Global warming
depletion of stratospheric ozone
acidification of land and water sources
eutrophication
formation of tropospheric ozone
depletion of nonrenewable energy resources

Exemplary performance
option 1 - 40 products
option 2 - 75% by cost

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

MR Credit - Building Product Disclosure and Optimization - Sourcing of Raw Materials

A

One or both options
-Option 1 - Raw Materials Source and Extraction Reporting
20 permanently installed products from 5 manufacturers who have publicly released a report from suppliers on extraction and environmental impact
*self report 50% or product for credit
*3rd party reported, 100% product
Acceptable CSR frameworks
Global Reporting Initiative (GRI)
Organization for Economic Co-operation and Development (OECD) Guidlines for multinational Enterprises
U.N. Global Comact: Communication of Progress
ISO 26000:2010 Guidance on Social Responsibility
UGBC Approved program
-Option 2 - Leadership Extraction Practices
must use at least 1 of responsible extraction criteria for at least 25% by cost of permanently installed products
*extended producer responsibility - take backs
*biobased materials. Must meet Agriculture Network’s Sustainable Agriculture Standards (SAN)
*Certified wood products
*Material reuse
*recycled content
*USGBC approved program

sourced within 100 miles valued at 200%

exemplary performance
option 1 - 40 products 5 manufacturers
option 2 - 50% by cost

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

MR Credit - Building Product Disclosure and Optimization - Material Ingredients

A

Must choose an option
-Option 1 - Material Ingredient Reporting (1pt)
20 different products from 5 manufacturers that use the following programs to demonstrate the chemical inventory of at least .1% (1000 ppm)
*Manufacturers inventory with name and Chemical Abstract Service Registration Number (CAS RN)
*Health Product Declaration version 1.0 (HPD)
*Cradle to cradle v2 basic level or cradle to cradle v3 bronze
*USGBC approved program
-Option 2 - Material Ingredient Optimization (1pt)
must use 1 of 4 paths for 25% of total products in building
* Greenscreen list Translator 100%
*Greenscreen Assessment 150% of cost
*Cradle to Cradle V2 Gold 100%
*Cradle to Cradle V2 platinum 150%
*Cradle to Cradle V3 Silver 100%
*Cradle to Cradle V3 gold or platinum 150%
*International Alternative Compliance path - Reach Optimization 100%
*USGBC approved program
-Option 3 - Product Manufacturer Supply Chain
25% by cost of total value of products are sourced from manufacturers who engage in robust safety, health, hazard and risk programs

within 100 miles 200%

Exemplary performance
option 1 - 40 products
option 2 - 50%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

MR Credit - Furniture and Medical Furnishings (Healthcare only)

A

project must use 30% (1pt) or 40% (2pt) by cost of all free standing and medical furnishings that meet 1 of 3 available options
-Option 1 - Minimal Chemical content
5% by weight must contain less than 100 ppm of at least 4 of 5 chemical groups
*urea formaldehyde
*heavy metals
*hexavlanet chromium in plated finishes constistent with European Union Directive on the Restriction of the Use of Certain Hazardous Substances (EU RoHS)
*stain and nonstick treatments derived from PFCs and including Perfluorooctanoic acid (PFOA)
*added antimicrobial materials
-Option 2 - Testing and Modeling of Chemical Content
must contain less than 100 ppm of at least 2 of 5 chemicals in option 1
new must be ANSI/BIFMA Standard Method e3-2010 Furniture Sustainability Standard section 7.6.1 and 7.6.2
salvaged or reused must be over 1 year old
-Option 3 - Multi-attributed Assessment of Products
must use products that meet at least 1 of the criteria below
*Products specific declaration valued at 25%
*industry wide vlaued at 50%, product specific type 3 at 100%
*materials reuse
*recycled content
*extended producer responsibiity
biobased materiasls
*wood products
100 miles 200%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

MR Credit - Design for Flexibility (healthcare only)

A

Must implement at least 3 of the strategies below
-Use interstitial Space
-Provide programmed Soft Space - 5% of departmental Gross Area (DGA) adjacent to clinical space
-Provide Shell Space - 5% of DGA
-Identify Horizontal expansion - capacity for at least 30% of diagnostic and clinical space without demolition of occupied spaces
-Design for Vertical Expansion - could use 75% of roof and ensure operation and service systems continue
-Designate space for future parking structures - 50% of exisitng on grade parking capacity
-Use Demountable Partitions - 50% of applicable areas
-Use Modular or Movable Casework - at least 50% of millwork bsaed on the combined value of casework and millwork

How well did you know this?
1
Not at all
2
3
4
5
Perfectly