MasterFormat Groups & Subgroups Flashcards
1
Q
MasterFormat Groups
A
- Procurement and Contracting Requirements
- Specifications
2
Q
Procurement and Contracting Requirements Group
A
Division 00 — Procurement and Contracting Requirements
3
Q
Specifications Group
A
- General Requirements Subgroup
- Facility Construction Subgroup
- Facility Services Subgroup
- Site and Infrastructure Subgroup
- Process Equipment Subgroup
4
Q
General Requirements Subgroup
A
- Division 01 — General Requirements
5
Q
Facility Construction Subgroup
A
- Division 02 — Existing Conditions
- Division 03 — Concrete
- Division 04 — Masonry
- Division 05 — Metals
- Division 06 — Wood, Plastics, and Composites
- Division 07 — Thermal and Moisture Protection
- Division 08 — Openings
- Division 09 — Finishes
- Division 10 — Specialties
- Division 11 — Equipment
- Division 12 — Furnishings
- Division 13 — Special Construction
- Division 14 — Conveying Equipment
6
Q
Facility Services Subgroup
A
- Division 21 — Fire Suppression
- Division 22 — Plumbing
- Division 23 — Heating, Ventilating, and Air Conditioning (HVAC)
- Division 25 — Integrated Automation
- Division 26 — Electrical
- Division 27 — Communications
- Division 28 — Electronic Safety and Security
7
Q
Site and Infrastructure Subgroup
A
- Division 31 — Earthwork
- Division 32 — Exterior Improvements
- Division 33 — Utilities
- Division 34 — Transportation
- Division 35 — Waterway and Marine Construction
8
Q
Process Equipment Subgroup
A
- Division 40 — Process Interconnections
- Division 41 — Material Processing and Handling Equipment
- Division 42 — Process Heating, Cooling, and Drying Equipment
- Division 43 — Process Gas and Liquid Handling, Purification and Storage Equipment
- Division 44 — Pollution and Waste Control Equipment
- Division 45 — Industry-Specific Manufacturing Equipment
- Division 46 — Water and Wastewater Equipment
- Division 48 — Electrical Power Generation