Mass Movements: Overstrand, North Norfolk coast Flashcards
1
Q
When were mass movements mainly?
A
1990’s
2
Q
How much did the council spend on management?
A
£3 million
3
Q
What 3 HARD engineering techniques have been put in place?
A
- Rock armour at base of the cliff (costing £1000 a rock)
- Groynes to trap sand and build up beach.
- Revetements.
4
Q
What 3 SOFT engineering techniques have been put in place?
A
- Clay and sand layers mixed together to increase permeability.
- Drainage pipes planted to drain excess water.
- Slope re-graded to a lower angle, reduce likelihood of mass movements.