Maint Control/Production Control Flashcards

1
Q

How long is a daily Inspection of an aircraft valid?

A

72 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How long is a Turnaround Inspection of an aircraft valid?

A

24 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What record entries are required for aircraft acceptance inspections and transfer inspections?

A

Aircraft logbook

AESR entry on the inspection page titled “Conditional”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What form is used to record SE issue and receipt transactions?

A

OPNAV Form 4790/64 Support, Support Equipment Transaction Report

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When does IMA SE Broad Arrow (BA) reporting occur?

A

When there is an item of operative SE and there no redundancy in that piece of SE thereby jeopardizing the operational readiness of supported units.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

When does a Broad Arrow exist?

A

When an item of SE bench/test set/OPTS/rolling stock is inoperative and an IMA has lost the capability to support or repair aeronautical components that will impact the readiness of supported activities.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How are all entries made in the aircraft logbooks/records?

A

Either typewritten or plainly printed using a ballpoint pen with black ink, except where pencil entries are authorized.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly