LOTO Flashcards

1
Q

What is Lock Off Tag Out?

A

It is a method of safely isolating systems and equipment electrically and mechanically.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  1. The of equipment to allow to proceed without hazard to the of the equipment
    * 4 main reasons for conducting LOTO*
A
  • Isolation
  • maintenance
  • Maintainer
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  1. Where is defective and may be to .
    * 4 main reasons to conduct LOTO*
A
  • Equipment
  • dangerous
  • operate
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  1. Prevention of of a which may be .
    * 4 Main reasons for conduction LOTO*
A
  1. Selection
  2. Mode of operation
  3. unavailable or dangerous
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  1. Where have been provided but has .

4 main reasons for conduction LOTO

A
  • Supplies
  • yet to be fitted
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  1. All normal and isolation points .
    * 7 considerations to be conducted as part of Loto process*
A
  • Alternative
  • have been identified
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  1. from authorising .
    * 7 considerations to be conducted as part of Loto process*
A
  • Obtain permission
  • Technical rate
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  1. Equipment user and that may be .
    * 7 considerations to be conducted as part of Loto process*
A
  • Other personnel
  • Affected are informed
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  1. A Separate is to be filled out for each .
    * 7 considerations to be conducted as part of Loto process*
A
  • LOTO label
  • Individual isolation point
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  1. The next is to be from the index.
    * 7 considerations to be conducted as part of Loto process*
A
  • Sequential number
  • identified
  • Loto log
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  1. All to be completed in the .
    * 7 considerations to be conducted as part of Loto process*
A
  • details
  • front of the LOTO log
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  1. All the is to be recorded on a .
    * 7 considerations to be conducted as part of Loto process*
A
  • LOTO information
  • LOTO safety certificate
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the four main reasons for conducting LOTO?

No. 1

A
  1. The isolation of equipment to allow maintenance to proceed without hazard to the maintainer of the equipment.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are the four main reasons for conducting LOTO?

No.2

A

Where equipment is defective and may be dangerous to operate.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are the four main reasons for conducting LOTO?

No.3

A

Prevention of selection of a mode of operation that may be unavailable or dangerous.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What are the four main reasons for conducting LOTO?

No.4

A

Where supplies have been provided but has yet to be fitted

17
Q

What are the 7 considerations which must be conducted as part of the LOTO process?

No.1

A

All normal and alternative isolation points have been identified.

18
Q

What are the 7 considerations which must be conducted as part of the LOTO process?

No.2

A

Obtain permission from authorising technical rate.

19
Q

What are the 7 considerations which must be conducted as part of the LOTO process?

No.3

A

Equipment user and others that may be affected are informed.

20
Q

What are the 7 considerations which must be conducted as part of the LOTO process?

No.4

A

A separate LOTO label is filled out for each individual isolation point

21
Q

What are the 7 considerations which must be conducted as part of the LOTO process?

No.5

A

The next sequential number is identified in the LOTO log index

22
Q

What are the 7 considerations which must be conducted as part of the LOTO process?

No.6

A

All details are to be completed in the front of the LOTO log

23
Q

What are the 7 considerations which must be conducted as part of the LOTO process?

No.7

A

All LOTO information is to be recorded on a LOTO safety certificate