List 1 Flashcards

1
Q

State the system code for the primary circuit

A

M

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

List the 3 containment boundaries

A

Primary
Intermediate
Secondary

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the function of the steam generators

A

A) Produce high quality steam for the operation of the main and turbo generator (TG) turbines and auxiliary steam systems

B) Remove decay heat from the reactor core using the SG cool-down system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

List 5 items from SG drawing

A

1) separator assembly
2) driers
3) kinetic head destroyer
4) feed water inlet nozzle
5) SG main support
6) downcomer
7) tube bundle assembly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the function of the auxiliary steam system

A

To supply steam at a constant pressure of 14 bar to the following:
A) main air ejectors
B) gland steam system
C) distilling plant calorifiers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Label main steam system diagram

A
214 = TGCSEV
212= dump steam valve 
202=MTETV
215=main steam cross connection 
402=MSSV
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Describe the basic operation of the glad steam system

A

Steam is supplied to the gland steam system manifold from the auxiliary steam system at a pressure of 14 bar. Steam from the gland steam manifold passes through cascade trim valves to the following:

A) generator turbine shaft gland pockets
B) main turbine shaft gland pockets

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

State 2 components of the steam drain system

A

1) Yarway steam trap

2) key trap

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Why is there a separating wall between the ahead/astern sections of the main turbine

A

Prevent steam leakage between them

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the system code for the primary relief system

A

R

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the functions of the main circulating water system

A

A) provide a flow of calling water to the main condenser so that optimum condenser vacuum and steam conditions can be maintained in the main turbines and TG’s

B) supply the after stern tube bearing with water for cooling and lubrication

C) provide a supply of water to the clean sea water system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Describe the construction of the clean sea water system pump

A

Is a glandless, canned centrifugal pump. Each pump is solidly mounted on its own side main condenser hotwell

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

List 4 items from cooled by the Fwd ship’s fresh water cooling system

A

1) chilled water plants
2) 70kw MG sets
3) 35kw MG sets
4) 10kw MG sets
5) H2 burners
6) R12 removal unit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What does S.L.I.V stand for and what does it do

A

Surge Line Isolating Valve

Provides a means of isolating the pressuriser from the primary circuit in the event of a pressuriser leak circuit when the valve is shut, provided pressuriser pressure is greater than RPV pressure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What order do the primary relief valves reset

A

High, low, steam

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is the function of the coolant treatment system

A

A) to remove soluble and suspended radioactive corrosion and fission products from the primary coolant during reactor operation, whilst assisting to maintain the pH

B) provide a connection to the sampling system before and after the ion exchange column

C) ensures water discharged from the primary circuit is at its lowest level of contamination

D) removal of decay heat using the non regen cooler when in LPDHR

17
Q

Coolant discharge system- where does the HP discharge go

A

A) discharge to the MUD vessel

B) overboard via D406

18
Q

What are the 3 sub sections of the coolant make up system

A

1A) recirculation system (normal)
B) Back up system (de-ox/demin system)
C) emergency system

19
Q

Components of the primary shield system

A

A) A steel tank surrounding the reactor pressure vessel (RPV) which contains:

1) RCFW cooling coils
2) Neutron Detectors
3) Core catcher
4) test source track

B) a shield water tank with interconnecting piping and valves

20
Q

2 methods of using the HPDHR system

A

1) forced high pressure decay heat removal FHPDHR

2) natural high pressure decay heat removal NHPDHR

21
Q

What is the system code of the coolant treatment system

A

W