1
Q

NOx Limits

A

0.09 lb/MBTU 24 hr average

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

SO2 Limits

A

0.16 lb/MBTU 3hr average

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

CO Limits

A

1003 lb/hr 30day average
Slag conditions >150ppm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Hg Limits

A

1.2 lb/TBTU 30 day average

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Opacity Limits

A

10% 6min average

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Reheat protection

A

Total fuel >20% with turbine not in service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Furnace pressure Limits

A

+/- 12inches of water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Drum level Limits

A

+11.25” / -10”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Total Air Limits

A

< 28.7% unit trip
43% minimum in auto
35% for purge

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

DAST lvl

A

100” set point

> 136” turbine trip
118” dump valve opens
< 12” Both BFPs trip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

RAH outlet temp Limits

A

> 350F on 2of3 probes on either RAH trips the plant.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Slaking Temp

A

Normal set point 180F
not to exceed 100degree rise from inlet temp.
High Temp trip 195F
Warming cycle required <120F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Dilution water tank Limits

A

Set point 160”
High level cut off 172”
Pump trip 48”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Condenser hotwell Limits

A

High alarm 37”
Set point 32”
Pump trip 15”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Cooling Tower basin Limits

A

Set point 225”
High 234” (shuts fill valve)
240” overflow
200” point of accelerating concern
172” Pumps trip => unit trip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Service Water tank Limits

A

Normal 35.5’-36.5’
Overflow 37.2’
Pump trip 31’

17
Q

Condenser vacuum Limits

A

Normal 1.2psia
Turbine reset 1.7
C Vacuum pump auto start 1.9
Turbine trip 3.6

18
Q

Slurry tank

A

10% - slurry pump trip
75% - normal set point
60-80% batch start/stop
85% - High level shutoff
50% - mixer shut off

19
Q

Main Lube oil pressure Limits

A

23psi Normal
16psi low alarm (turbine roll permit)
10psi turbine trip (2/3 press switches)
No AC pump running 20 seconds => turbine trip

20
Q

Stator cooling water Limits

A

203F Return water temp Trip
130-150 normal Return temp
118F supply hdr set point
Low pressure Turbine Trip on 2/3 pressure switches (~30psi)

21
Q

Mill Trips

A

Coal gate shut
Feeder stop
All cut dampers shut
Air flow <48%
Lube Oil pressure <11psi
Outlet Temp >165F

22
Q

Exhaust Hood temp Limits

A

125F normal
>175 Alarm
>225F Turbine Trip

23
Q

EHC pressure Limits

A

Normal 2450psi
1950psi - standby pump starts
1650psi - Turbine Trip

24
Q

Turbine Bearings Limits

A

Vibrations:
Alarm at 5mils.
Trip at 7mils

Journal bearings
Alarm 225F
Trip 250F

Thrust bearings
Alarm 208F
Trip 221F

25
Boiler Feedpump Limits
Trips: Strainer DP 7psid High vibrations High bearing temp High LO temp 12psi LO pressure low or LO pressure BQ 0 NPSH 4080psi Discharge pressure high 475kpph Low flow (Recirc set point 1200kpph) 12” Low DAST lvl
26
ID Fan inlet duct Limits
-36” on 2/3 trips both Fans =>MFT -32” “ID Fan Master Inlet Press Override Sacrifices furnace pressure control to prevent fan trip
27
Drum metal temp Limits
Max difference top to bottom 100F Max rate +/-50F/hr up to 212 Max rate +/-100F/hr >212 * differential thermal expansion causes stress fractures which reduce the life of the plant. Limits apply to both warming and cooling.
28
Bottom Ash drag chain Limits
Oil pressure > 1850psi Tensioner > 11” Tensioners > 2” different Speed switches ok.
29
PA fan Runback
250MWG (34%)
30
RAH Runback
250MWG (34%)
31
ID Fan Runback
333 MWG (45%)
32
FD Fan Runback
250 MWG (34%)
33
BFP Runback
333MWG (45%)
34
2 Mill Runback
333 MWG (45%)
35
Mill trip Runback (3 Mills on)
503 MWG (68%)