LESSON 6: TRAVERSE SURVEYING Flashcards

1
Q

Type of survey in which several connected survey lines form the framework and the directions and lengths of the survey lines are measured with the help of an angle measuring instrument and tape or chain respectively.

A

TRAVERSING

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When the lines form a circuit which ends at the starting point, it is known as a ________

A

Closed Traverse

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When the lines form a circuit ends elsewhere except the starting point, it is an _______

A

Open Traverse

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The ______ is always measured parallel to the reference meridian (North-South line) and the _______ is always perpendicular to it

A

latitude, departure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The_____ is usually a short line of unknown length and direction
connecting the initial and final stations of the traverse.

A

linear error of closure (LEC)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The ________ is solved by taking the ratio of the linear error of closure (LEC) to the total length of the traverse

A

relative error or precision

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The procedure of computing the linear error of closure and applying corrections to the individual latitudes and departures to provide a mathematically closed figure.

A

Traverse Adjustment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The DMD of the last course is equal to the _____ course but with the opposite sign.

A

departure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The DPD of the last course is equal to the ______ course but with the opposite sign.

A

latitude

How well did you know this?
1
Not at all
2
3
4
5
Perfectly