[L8]_WIND TURBINES AND THE GRID Flashcards
ENGY-688
(True/False): A one-line riser diagram represents all the mechanical components of a wind turbine generation system.
[L8]
False. It represents all electrical components, including wires, wire sizes, shielding, and grounding.
[L8]
ENGY-688
Match the components to their primary role in a wind turbine system:
A. Generator grounding
B. Power electronics converter
C. Soft starter
- Controls in-rush current
- Provides phase compensation and AC-DC-AC conversion
- Ensures safety during fault conditions
[L8]
A: 3
B: 2
C: 1
[L8]
ENGY-688
What is the primary material used in ACSR 26/7 cables for overhead transmission lines?
A. Pure aluminum
B. Aluminum Conductor Steel Reinforced
C. Aluminum Composite Conductor Reinforced
D. Copper
[L8]
B. Aluminum Conductor Steel Reinforced
[L8]
ENGY-688
(True/False): Wind turbine generator (WTG) projects under 10 MW typically connect to transmission lines.
[L8]
False. They connect to distribution lines.
[L8]
ENGY-688
(Multiple Choice): What is the minimum power factor wind farms are required to maintain since 2005?
A. 0.85
B. 0.90
C. 0.95
D. 1.00
[L8]
C. 0.95
[L8]
ENGY-688
(True/False): Power flow studies analyze if energy transfer from generators to consumers meets grid requirements in terms of voltage levels and line loading.
[L8]
True
[L8]
ENGY-688
(True/False): A lower power factor reduces the apparent power required for a system to produce the same amount of real power.
[L8]
False. A higher power factor reduces the apparent power required.
[L8]
ENGY-688
What is the maximum allowable voltage drop duration for low-voltage ride-through (LVRT)?
A. 0.5 seconds
B. 0.625 seconds
C. 1 second
D. 1.5 seconds
[L8]
B. 0.625 seconds
[L8]
ENGY-688
(True/False): Harmonics in wind turbines are caused by the imperfect sinusoidal wave generated during the AC-DC-AC conversion stage.
[L8]
True.
[L8]
ENGY-688
Match the wind farm layouts to their descriptions:
A. Radial
B. Feeder-sub-feeder
C. Looped feeder
- High redundancy, minimizes generator downtime.
- Most commonly used layout.
- Lowest cost but highest risk of system downtime.
[L8]
A: 3
B: 2
C: 1
[L8]
ENGY-688
(True/False): Intelligent electronic devices (IEDs) in WTGs are responsible for real-time protection, monitoring, and logic system operations.
[L8]
True.
[L8]
ENGY-688
Which interconnection request type is for systems greater than 20 MW?
A. SGIR
B. LGIR
C. AGIR
D. TGIR
[L8]
B. LGIR
[L8]
ENGY-688
What is the typical reaction time for circuit breakers in WTG protection systems?
A. 0.05 seconds
B. 0.1 seconds
C. 0.5 seconds
D. 1 second
[L8]
B. 0.1 seconds
[L8]
ENGY-688
(True/False): Grounding systems in wind turbines ensure equipotential bonding among all metallic components.
[L8]
True
[L8]
ENGY-688
Which standard governs lightning protection design for WTGs?
A. IEEE 1547
B. IEC 61400-24
C. NFPA 70
D. EN 55022
[L8]
B. IEC 61400-24
[L8]