Jeopardy Deck Flashcards
You must do this in order for the microinverters to communicate with the envoy
Provision microinverters
An Envoy R uses these two forms of communication to connect to the Enlighten portal
Wifi and Ethernet
These two devices are used to help reduce noise interference on Enphase systems
Ferrite rings and In-line Filters
Navigate to this in the Enphase portal to see how far along a data upload has caught up to
Admin view of the envoy
This microinverter sku is the compatible replacement for a M215
A M215-IQ7
When swapping an A series to an H series a technician requires this duration
3 Hours
You use this function in SolarEdge portal to update the inverter after it has been replaced
Logical Layout - Replace function
The 3x6E Error in SolarEdge indicates this
3x6E Meter Communication
SolarEdge inverters requires this number of panels to be paired to it in order for it to be able to have enough voltage to ‘wake up’
8 Panels
When the middle LED light on the inverter is flashing green, it indicates this
AC is connected but the system is not producing
These two things must be listed in Salesforce assets as meters for Enphase systems in order for the system to report to NOC/Spotlight
The Enlighten site ID and the Envoy serial number
SolarEdge and Delta inverters are listed in Salesforce assets as this
A meter
This is needed in ALL assets in order to report to NOC/Spotlight
In service dates
When entering a CAT M1 serial number into Salesforce assets you add in what portion of the serial number
The numeric portion only
This is used as the meter asset for Vivint migrated Fronius systems
The Fronius portal site ID
We must be able to see the gateway in this in order to see production data in NOC/Spotlight from Tesla
Powerhub
Most systems is Califorina use this type of battery profile
Time of Use (TOU)
The 3x6B Error in SolarEdge indicates this
A battery communication error
These are the 5 manufacturers of batteries that Vivint/Sunrun has installed
LG, Tesla, Sonnen, SolarEdge and Enphase
Due to NEM 3.0 in California, this setup will be used for new battery installs
SHIFT
All systems must have this in order to be serviced
Permission to Operate(PTO)
For deactivation cases once you have disabled power production OR set the inverter to standby you should ALWAYS do this
Set the account status to ‘Deactivated’ On the Service Contract page
Systems in these three states are required to report through RGM for SREC purposes
New Jersey, Massachusetts & Illinois
In these three utility service areas that are part of NEM 3.0 we have to submit DSR for inverter replacement that would require upsizing
PG&E, SDG&E and SCE