Intergrative Process Flashcards

You may prefer our related Brainscape-certified flashcards:
1
Q

When can certification be revoked?

A

Certification may be revoked from any LEED project upon gaining knowledge of non-compliance with any applicable MPR. If such a circumstance occurs, registration and/or certification fees will not be refunded.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is technical release (TR) 55?

A

An approach to hydrology in which watersheds are modelled to calculate storm runoff volume, peak rate of discharge, hydrographs, and storage volumes, developed by the former USDA soil conservation service.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What energy related building aspects must be considered for integrative process?

A

Site conditions.
Massing and orientation.
Basic envelope attributes.
Lighting levels.
Thermal comfort ranges.
Plug and process load needs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What Water-related building aspects must be considered for integrative process?

A

Interior water demand.
Outdoor water demand.
Process water demand.
Supply sources.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How many potential strategies must be assessed for each Energy-related building aspect for integrative design?

A

At least two strategies must be assessed for each of the six aspects.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What tool is used to benchmark building performance for integrative design?

A

EPA’s Target Finder

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What LEED ND certification designations are eligible for LEED ND location credit?

A

LEED ND Pilot, stage 2 LEED ND certified plan.
-LEED ND pilot, stage 3 LEED ND certified project.
-LEED 2009, Stage 2 Pre-certified LEED ND Plan
-LEED 2009, Stage 3 LEED certified Neighbourhood Development
-LEED v4 LEED ND Certified Plan
-LEED v4 LEED ND Certified Built Project

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The Integrative Design credit is optional for all rating systems except:_____

A

Healthcare

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

During the integrative process, at a minimum LEED requires that we ensure the following process:

A

-Owners Project Requirements Document
-Preliminary Rating Goals.
- Integrated Project Team.
-Design Charrette.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Pre-requisite for integrative project planning and design applies only to which rating system?

A

Healthcare

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Documentation which can be submitted to earn point for integrative process?

A

Complete a worksheet and provide a simple box energy model result.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Basic commissioning does not begin until the design documents are ______percent completed.

A

50%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

During the ‘Discovery’ process for Energy-related systems, perform a ________ analysis before ______ stage of the project

A

Preliminary “Simple Box” energy modelling analysis before completion of Schematic Design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

During the ‘Discovery’ process for Water-related systems, perform a ________ analysis before ______ stage of the project

A

Preliminary Water budget analysis before completion of Schematic design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly