any voluntary initiated
cooperative agreement between firms that
involves exchange, sharing, or co
development
INTER-FIRM ALLIANCE
Architect also has vicarious liability for any damage caused by the consultant’s negligence.
INTER-PROFESSIONAL RELATIONSHIPS
Architects are ____
to other professionals or
_____ to construction
contractors.
sub-consultants, subcontractors
Architect also has vicarious liability for any damage caused by the consultant’s ______
negligence
most common inter-professional
relationship
BETWEEN ARCHITECT AND PROFESSIONAL ENGINEER
outlined in the architect-consultant
agreement.
CONSULTANT SERVICES
________ establish the
services to be included in the architect’s
agreement, both parties may consider the
need for the services of other design
professionals.
ARCHITECT AND OWNER
Professional service identified
- The architecture firm, through its own staff.
2.A design professional subcontracted to the
architecture firm. - A consultant to the owner
- Owner
This arrangement may include a construction
manager, a project or program manager, an
independent design professional for another
portion of the project, or another architecture
firm performing a portion of the architecture
services—with or without coordination by the
architect.
A consultant to the owner
TWO OBJECTIVES OF CLARIFYING RESPONSIBILITIES B/W ARCH. AND OWNER
- Role in project planning
- Responsibilities of the architect.
memorandum of terms and
conditions for each member in a design build project, legal document as it is the basis for subsequent contracts between parties
TEAMING AGREEMENT
The project design team may be a very smal group even a single architect who has the necessary expertise and performs al of the professional services required. Often, however, the team includes ___________
another firm with special expertise in building engineering systems.
Architect-consultant relationship may be (3)
- established just for project at hand
- strategic alliance
- long standing working relationship
Design-build team members are usually selected on the: (4)
- basis of the experience
- expertise
- value
- reputation
TWO BASIC OPTIONS FOR ORGANIZATIONAL STRUCTURE
- to form an individual entity; joint venture or limited liability company
- one of the team member will have the prime contract with the owner
FACTORS TO BE CONSIDERED BEFORE SELECTING THE ORGNIZATIONAL STRUCTURE:
- must be compatible with the jurisdictional statutes and licensing laws.
- Owners preference
- Type of design-build project
- Liability issues
- Ability to achieve owner’s objectives
Options for Structuring a Design-Build Team
- JOINT VENTURE
- LIMITED LIABILITY COMPANY
- PRIME SUB-CONTRACTOR RELATIONSHIP
association of two or more entities for the purpose of performing a design-build project.
JOINT VENTURE
From both a legal and a tax standpoint
a joint venture is viewed as a _______
GENERAL PARTNERSHIP
The entities maintain their separate
identities and join forces, usually, for a
specific project.
JOINT VENTURE
An entity possessing attributes of both
a general partnership and a
corporation.
LIMITED LIABILITY COMPANY
For tax purposes, the LLC is treated as
a _________
PARTNERSHIP
The most common organizational
structure for performing design-build
projects.
PRIME-SUBCONTRACTOR RELATIONSHIP
This type of relationship enables the owner to receive the benefits of single
point responsibility and accountability.
PRIME-SUBCONTRACTOR RELATIONSHIP