Phases of Integrative Process?

A

Discovery
Design and Construction
Occupancy, Operations, Feedback

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Primary benefit of Integrative Process?

A

Opportunity for synergies that adopt cost-effective green design and construction strategies.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Before which phase should energy and water system be addressed when implementing the IP-C Integrative Process?

A

Schematic Design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Order in which energy and water systems should be analyzed to maximize synergies from the IP-C Integrative Process?

A

Both should be analyzed at the same time since they are co-dependent. Integrate a solution that effects both. Example: solution for energy consuming hot water systems.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Ideal time to create the OPRs for a Healthcare project. ?

A

Prior to Schematic Design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Tool to use when conducting preliminary energy research and analysis?

A

EPA Target Finder Tool. Benchmarks energy performance for project type, scope, occupancy, and location prior to detailed design decisions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Goal Setting Workshop should accomplish?

A

Team introduction to IP fundamentals
Share research and analysis
Elicit owner and stakeholder values
Clarify functional and pragmatic goals
Establish principles, benchmarks, metrics, and performance targets
Identify targeted credits
Generate strategies for achieving performance targets
List questions that must be answered to support project decisions
Identify responsibilities and deliverables
Initiate OPR documents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is a Water Budget?

A

Project specific calculation of
Demand - indoor, outdoor, process, make-up
Supply - onsite and rainfall.

Must be associated with length of time and quantity.
Example: kGal/Month

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is a simple Box Energy Model?

A

Energy assessment of simple building form.
Analyzes:
Basic distribution of energy uses
Dominant energy loads.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Components that should be modeled in preliminary energy analysis to achieve the IP-C Integrative Process?

A

Any component with a significant impact on energy use.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Information that should be included in the preliminary water budget analysis during the discovery phase?

A

Data from a specific period that includes quanitites of indoor, outdoor, process, makeup, and onsite supply water offsets.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Reason project team should review ANSI Consensus National Standard Guide 2.0 - Design and Construction of Sustainable Buildings and Communities

A

To become familiar with integrative process and steps for implementing.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Documentation required for Healthcare project to meet IP-P Integrative Project Planning and Design?

A

Narrative explaining how health mission statement addresses credit requirements and action plan from the preliminary rating goals.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Rating system adaptation that requires a 4 hour integrative design charrette as prerequisite?

A

Healthcare

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

LEED V4 credit that requires team to identify at least 1 onsite, non potable water source for offsetting two types of water demand?

A

IP-C Integrative Process

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Four activities that must be completed to comply with IP-P Integrative Project Planning and Design for a Healthcare project?

A

Prepare OPR with Health Mission Statement
Assemble Integrated Project Team
Conduct 4 hour minimum design charrette
Determine preliminary rating goals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Which guidance document should a LEED AP recommend to the project team for guidance on the Integrative Process?

A

ANSI Consensus Standard Guide 2.0

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

How many hours should a be set aside for LEED healthcare IP-P Integrative Project Planning and Design?

A

4 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Minimum number of members, including Owner’s rep, that must compromise an integrated project team to achieve IP-P - Integrative Project Planning and Design for Healthcare Project?

A

5 - 4 professionals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Box Energy Model analysis should assess at least 2 potential strategies associated with 7 aspects of a project to meet IP-C Integrative Process. 7 Aspects?`

A
Site Conditions
Massing and Orientation
Basic Envelope Attributes
Lighting Levels
Thermal Comfort Ranges
Plug and Process Load Needs
Programmatic and Operation Parameters
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

When should design charrette meet to achieve IP-P Integrative Project Planning and Design for Healthcare Project

A

As early as practical. Before schematic design.

22
Q

What is the goal of conducting integrative design charrette for Health Care projects

A

Optimize integration of green strategies across all aspects of building design, construction, and operations.

23
Q

Ideal time to assemble an integrative project team in order to maximize benefits to the project?

A

During predesign or at start of design.

24
Q

LEED V4 credit or prerequisite that requires narrative explaining how the health mission statement addresses credit requirements?

A

IP-P Integrative Project Planning and Design

25
Q

Findings of energy and water analysis performed for IP-C Integrative Process should inform which project documents?

A

OPRs
BOD
Design documents
Construction documents

26
Q

Number of potential strategies a simple box energy model analysis must assess to meet a minimum IP-C Integrative process?

A
  1. At least two potential strategies for each of the 7 aspects.
27
Q

Aspects of water use that should be assessed and estimated during discover phase of Hospitality project pursuing IP-C Integrative Process?

A

Indoor demand
Outdoor demand
Process demand
Supply sources

28
Q

Office building project pursuing IP-C Integrative Process. In discovery team analyzes on-site nonpotable water supply sources to be used for two water demand areas. List 4 potential nonpotable water supply sources that they can use.

A

Rainwater
Greywater
Municipality nonpotable water
HVAC equipment condensate water

29
Q

Requirement pertaining to nonpotable water use during the implementation phase of water-related systems for IP-C Integrative Process.

A

At least one on-site nonpotable water supply source should be used to reduce the burden on municipal supply or wastewater treatment systems. Should address at least 2 project water demand components.

30
Q

Most importance phase of Integrative Process for cost-effective achievement of project’s environmental goals?

A

Discovery Phase

31
Q

EPA Target Finder Tool can be used for benchmarking during which process?

A

Integrative Process

32
Q

What is a goal-setting workshop?

A
Workshop that determines:
project goals
budget
schedule
functional programmatic requirements
scope
quality
performance
occupant expectations
33
Q

When should Simple Box Energy Model be conducted to meet IP-C Integrative Process?

A

Before schematic design

34
Q

Documentation required for IP-C Integrative Process?

A

Integrative Process Worksheet (Energy and Water Analysis Tabs)

35
Q

Next step after completing the preliminary energy and water system analysis under IP-C Integrative Process?

A

Convene a goal-setting workshop

36
Q

End uses a project’s simple box energy model analysis should provide analysis of?

A
Space Heating
Space Cooling
Ventilation
Domestic Hot Water
Lighting
Miscellaneous equipment
Other project specific end uses.
37
Q

Documentation needed for IP-C Integrative Process after the completion of the goal setting-workshop and the evaluation of possible energy strategies?

A

Description of how analysis informed design decisions in the project OPRs and BOD.

38
Q

First step of IP-C Integrative Process?

A

Become familiar with reviewing ANSI Consensus National Standard Guide 2.0q

39
Q

Which LEED V4 credit or pre-requisite requires a LEED action plan?

A

IP-P Integrative Project Planning and Design

40
Q

Which document incorporation of a health mission statement for LEED healthcare projects?

A

OPR

41
Q

Activities a LEED action plan require to meet IP-P Integrative Project Planning and Design

A

Determine certification level (silver..gold)
Select credits necessary to achieve certification
Identify responsible parties to ensure each credit/prerequisite is achieved.

42
Q

Information that should be collected when preparing for the integrative design charrette? IP-P

A
Local Climate
Site Conditions,
Waste Treatment Infrastructure,
Energy Load Distribution,
Water Sources,
Transportation Options,
Potential Building Features
43
Q

IP-P Integrative Project Planning and Design applies to which LEED adaptation?

A

Healthcare BD&C

44
Q

LEED V4 credit/prereq that require simple box energy modeling analysis?

A

IP-C Integrative Process

45
Q

Order in which energy and water strategies should be evaluated for IP-C Integrative Process?

A

At the same time to maximize synergies

46
Q

Integrative Process Worksheet used for documenting which LEED V4 credit/prereq?

A

IP-C Integrative Process

47
Q

Individual required in Healthcare project team to accomplish LEED cert?

A

Owner Representative

48
Q

Which activity, drawing on expertise of all participants, optimizes integration of green strategies across BD,C,O/M?

A

Integrative Design Charrette

49
Q

Simple Box Energy Modeling Analysis conducted for IP-C Integrative Process is a starting point for which other LEED V4 credit?

A

EA -C Optimize Energy Performance

50
Q

Requirements for water-related systems that must be completed during discovery phase?

A

Preliminary water budget analysis to explore reducing potable water loads in building.

Assess and estimate project’s potential nonpotable water supply sources and demand volumes.