Integrative Process Flashcards
Phases of Integrative Process?
Discovery
Design and Construction
Occupancy, Operations, Feedback
Primary benefit of Integrative Process?
Opportunity for synergies that adopt cost-effective green design and construction strategies.
Before which phase should energy and water system be addressed when implementing the IP-C Integrative Process?
Schematic Design
Order in which energy and water systems should be analyzed to maximize synergies from the IP-C Integrative Process?
Both should be analyzed at the same time since they are co-dependent. Integrate a solution that effects both. Example: solution for energy consuming hot water systems.
Ideal time to create the OPRs for a Healthcare project. ?
Prior to Schematic Design
Tool to use when conducting preliminary energy research and analysis?
EPA Target Finder Tool. Benchmarks energy performance for project type, scope, occupancy, and location prior to detailed design decisions.
Goal Setting Workshop should accomplish?
Team introduction to IP fundamentals
Share research and analysis
Elicit owner and stakeholder values
Clarify functional and pragmatic goals
Establish principles, benchmarks, metrics, and performance targets
Identify targeted credits
Generate strategies for achieving performance targets
List questions that must be answered to support project decisions
Identify responsibilities and deliverables
Initiate OPR documents
What is a Water Budget?
Project specific calculation of
Demand - indoor, outdoor, process, make-up
Supply - onsite and rainfall.
Must be associated with length of time and quantity.
Example: kGal/Month
What is a simple Box Energy Model?
Energy assessment of simple building form.
Analyzes:
Basic distribution of energy uses
Dominant energy loads.
Components that should be modeled in preliminary energy analysis to achieve the IP-C Integrative Process?
Any component with a significant impact on energy use.
Information that should be included in the preliminary water budget analysis during the discovery phase?
Data from a specific period that includes quanitites of indoor, outdoor, process, makeup, and onsite supply water offsets.
Reason project team should review ANSI Consensus National Standard Guide 2.0 - Design and Construction of Sustainable Buildings and Communities
To become familiar with integrative process and steps for implementing.
Documentation required for Healthcare project to meet IP-P Integrative Project Planning and Design?
Narrative explaining how health mission statement addresses credit requirements and action plan from the preliminary rating goals.
Rating system adaptation that requires a 4 hour integrative design charrette as prerequisite?
Healthcare
LEED V4 credit that requires team to identify at least 1 onsite, non potable water source for offsetting two types of water demand?
IP-C Integrative Process
Four activities that must be completed to comply with IP-P Integrative Project Planning and Design for a Healthcare project?
Prepare OPR with Health Mission Statement
Assemble Integrated Project Team
Conduct 4 hour minimum design charrette
Determine preliminary rating goals
Which guidance document should a LEED AP recommend to the project team for guidance on the Integrative Process?
ANSI Consensus Standard Guide 2.0
How many hours should a be set aside for LEED healthcare IP-P Integrative Project Planning and Design?
4 hours
Minimum number of members, including Owner’s rep, that must compromise an integrated project team to achieve IP-P - Integrative Project Planning and Design for Healthcare Project?
5 - 4 professionals
Box Energy Model analysis should assess at least 2 potential strategies associated with 7 aspects of a project to meet IP-C Integrative Process. 7 Aspects?`
Site Conditions Massing and Orientation Basic Envelope Attributes Lighting Levels Thermal Comfort Ranges Plug and Process Load Needs Programmatic and Operation Parameters