Installing Resilient Tile & Plank (LVT & LVP) Flashcards

1
Q

Native Origins, Uncommon Ground, Crete, Jeogori

A

Native Origins, Uncommon Ground, Crete, Jeogori

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

General ( A to H )

A

a. Ensure that moisture tests have been conducted and that the results do not exceed 87% (Shaw 4100 Adhesive) or
90% (when using Shaw S150 Adhesive) In-Situ relative humidity when tested according to ASTM F 2170.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

General

A

b. pH of concrete sub-floor is not greater than 10.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

General

A

c. The permanent HVAC system is turned on and set to a minimum of 68°F (20°C) for a minimum of 72 hours prior to,
during and after installation. After the installations, the maximum temperature should not exceed 100°F.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

General

A

d. Do not stack more than 5 cartons high.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

General

A

e. Flooring material and adhesive must be acclimated to the installation area for a minimum of 48 hours prior to installation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

General

A

f. Use a 1/32” deep x 1/16” wide x 1/32” apart (U) notch trowel only (unless using S150 Spray Adhesive where no trowel
is required).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

General

A

g. Material should always be visually inspected prior to installation. Any material installed with visual defects will not be
considered a legitimate claim as it pertains to labor cost.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

General

A

h. Make sure all material is from the same batch number. Install tiles running in same direction (arrows are on back of tile).
Ensure that all recommendations for sub-floor and jobsite conditions are met prior to beginning the installation.
Directional designs are optional, however, once the installation is started, you have accepted those conditions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

End General

A

End General

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

LAYOUT AND INSTALLATION (A to E )

A

a. Shaw tile and plank – Install using conventional tile and plank installation techniques. Plank products should have a
minimum of 6– 8” seam stagger.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

LAYOUT AND INSTALLATION

A

b. Carefully determining where to begin tile or plank installations produces professional looking results.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

LAYOUT AND INSTALLATION

A

c. It is customary to center rooms and hallways so borders are not less than half a tile or plank.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

LAYOUT AND INSTALLATION

A

d. In hallways and small spaces, it may be simpler to work lengthwise from one end using a center reference line as a guide.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

LAYOUT AND INSTALLATION

A

e. Make sure cut edges are always against the wall.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

End LAYOUT AND INSTALLATION

A

End LAYOUT AND INSTALLATION

17
Q

ADHESIVE APPLICATION ( A to B )

A

a. Use SHAW 4100 adhesive or equivalent and a 1/32” deep x 1/16” wide x 1/32” apart (U) notch trowel. Follow the
directions on the adhesive label. After placing the material into the adhesive, roll in both directions with a minimum
100 lb roller.

18
Q

ADHESIVE APPLICATION

A

b. Use SHAW S150 Spray Adhesive by holding can at regular arms length and pressing nozzle. No trowel is required and
product should be rolled with a 75 lb –100 lb roller.

19
Q

End Installation Inst.

A

End Installation Inst.