Q

In general, what does the Pollution Prevention Plan include?

A

Good housekeeping practices that are designed to prevent contamination of stormwater from a wide range of materials and waste that are generated by the construction process.

(Module 3 / Page 7)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are good housekeeping suggestions for waste management?

A
  • Designate trash collection area on site
  • Trash picked up daily
  • Trash collection located away from streets, waterways, and storm drains.
  • Secondary containment around waste collection area
  • Ability to cover waste container

(Module 3 / Page 7)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are good housekeeping suggestions for sanitary waste facilities?

A
  • Stabilized and located away from storm drain inlets and waterways
  • Well maintained

(Module 3 / Page 7)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are good housekeeping suggestions for hazardous materials and waste?

A

-Designated collection areas
-Secondary containment
(Labeled Properly and not leaking)

(Module 3 / Page 7)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are good housekeeping suggestions for building material handling and staging areas?

A
  • Designate areas for storage (Indoor storage for materials with the potential to contaminate stormwater)
  • Secondary containment in place to prevent spills from spreading and to protect groundwater
  • Designated areas for fueling and mixing paints, plaster, mortar

(Module 3 / Page 7)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are good housekeeping suggestions for paint and concrete washout areas?

A
  • Designate washout areas for specific materials
  • Locate away from storm drains and waterways
  • Adequately construct area and include liner
  • Dispose of washout material properly

(Module 3 / Page 7)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are good housekeeping suggestions for equipment fueling and maintenance practices?

A
  • Locate vehicle fueling or maintenance away from storm drains and waterways (under a covered area if possible)
  • Spill kit on site
  • Designate storage areas & label containers
  • Complete fueling and maintenance off-site if possible

(Module 3 / Page 7)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are good housekeeping suggestions for equipment washing?

A
  • Complete washing off-site if possible
  • Use designated areas that are contained
  • No use of detergents
  • No discharges to storm drain or waterway

(Module 3 / Page 7)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When must the SWPPP be amended?

A

Whenever there is a change in design, construction, operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters.

Or if self-inspections or regulatory compliance inspections determine existing control measures are ineffective in minimizing pollutant discharges from the construction activity.
(Module 3 / Page 4)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

When must the SWPPP be updated following any modification to its implementation?

A

7 days

Module 3 / Page 4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What does the SWPPP need to clarify with regards to contractors?

A

“The SWPPP must clearly identify the contractor(s) that will implement and maintain each control measure identified.”

(Module 3 / Page 4)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What should be included in an operator’s inspection report?

A

-Time and date of inspection/date and rainfall amount of last measurable storm
-Any discharges occurring during inspection
-Any land disturbing activities that occurred outside LOD.
-Identify any maintenance needs for ESC controls
-Have pollution prevention practices been implemented properly
-Any pollutant generating activity not identified in the P2.
(Module 3 / Page 4)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The SWPPP must be modified with any changes in design, construction, operation or maintenance, if any inspection has identified issues that need to be addressed, and dates when major grading has occurred. When else does the SWPPP need modified or updated?

A
  • When areas have reached final stabilization.
  • Dates when stabilization measures are initiated
  • Dates when construction activities temporarily or permanently cease
  • Dates of prohibited discharges, discharge volume released, actions taken to minimize impact of release

(Module 3 / Page 4)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What does “FEG” stand for with regards to erosion and sediment controls?

A

Federal effluent guidlines