Inspections/Cleanings/Running Gear Flashcards
- What are your types of inspections?
Level 1: noninvasive non specific
Level 2: noninvasive specific
Level 3: invasive specific
- How long does it take rank up as an inspector?
Level1: 1 year
Level2: 2 years
Level3: 3 years
- What is the inspection form #?
Inspection form 4730
- What is 081 NSTM?
Hull Cleaning
- What are the priorities for Hull cleaning? What is required after?
Running Gear, FWD 1/3, AFT ⅓ VTI paperwork
- What are the 4 classes of stave bearings?
Metallic less than 6” dial shaft
Metallic greater than 6” dial shaft
NonMetallic less than 6” dial shaft
Non Metallic greater than 6” dial shaft
- What chapter is propulsion bearings?
18
- What type of staves does the 774 have?
Partial Arc
- How many staves does the Ohio class sub have? 688?
Ohio- 26 688-24
- Range gap for the feeler gauge measurements?
.1-.5
- How long can a ship go before jacking a shaft?
14 days
- Access to Staves?
Deadlight holes, cover plates under the struts, mud tank, rope guard on sub
- How long are staves?
Come in 6 feet measurements
- How long are stave shells?
8-14’
- What are staves made of?
Rubber
- Where can you find staves on a sub?
Mud Tank
- Where do you measure staves?
Between the stave and stern tube, 6, 9, 3 o’clock positions
- Purpose of the staves?
Hydrodynamics, cooling, holding the weight of the shaft when idle
- How do you clean staves?
Hydrolance in between the staves for 1 foot per min 3x
- What do you do to a stave before install?
Freeze them, lube them with dawn dish detergent