IFR Company Ops Flashcards
When should it slow down for a hold?
3 min prior to fix
What power setting should you hold at?
Unless in icing, maximum endurance power
Can we do LP approaches?
No
What is the difference between IAP in the US and Canada?
Non towered you are in general cleared for an approach
Must let ATC know approach and if missed approach is expected
May not issue altitudes and transitions
When is a VFR/IFR flight plan required in Canada?
Flights more than 25 nm
What are two parts of a flight plan in Canada?
Master clearance
Search and rescue
When do flight plans open in Canada at untowered fields?
Automatically at time of departure
What are takeoff minimums for 91K?
Charter minimums
As low as 600 RVR
MPOD for adequate visual reference
What are part 135 take off minimums?
Charted minimums
Standard take off minimums (1sm) or lowest approach minimums
As low as600RVR
What are departure alternate minimums?
If weather is below landing minimums at departure then you must have an alternate airport with weather above landing minimums no more than 1 hour away
Who has to have weather while landing?
Alternate it destination
How do you fly into an airport without an approach what can you do?
Fly IFR then cancel when in VFR
What are destination weather minimums 91K?
No ceiling or visibility requirements
What are part 135 destination weather minimums?
Metar, taf, or combination must report above minimums
When is an alternate required for all operations?
1 hour before and after arrival
Higher of 1500’ added to lowest circling minimums
2000’ ceiling
Higher of 2sm added to lowest approach to be used
3 sm visibility