***Hoist Procedures*** Flashcards
When should the power available check be accomplished?
Prior to hoist operations
Where is the hoist power switch located?
On the left side of the overhead console panel
Where are the hoist circuit breakers located?
On the overhead circuit breaker panel
How many hoist cable cut switches are there and where are they located?
There are two:
- The pilot’s is on the center pedestal
- Hoist operator’s is mounted on the back of the rescue hoist control panel
What is the usable length of the hoist cable?
250 feet
What is the maximum operating load for the hoist?
600 lbs
T/F - When pulling the survivor into the helicopter, the easiest method is to turn the survivor’s back to the helicopter and pull in.
True
What should you do if the hoist OVERTEMP light comes on during hoist operations?
Terminate hoist operations as soon as possible, allowing the hoist to cool until the OVERTEMP light extinguishes
What is the maximum allowable load on the hoist when the speed mode switch is in the HIGH position?
300 lbs