***Hoist Procedures*** Flashcards

1
Q

When should the power available check be accomplished?

A

Prior to hoist operations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Where is the hoist power switch located?

A

On the left side of the overhead console panel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Where are the hoist circuit breakers located?

A

On the overhead circuit breaker panel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How many hoist cable cut switches are there and where are they located?

A

There are two:

  1. The pilot’s is on the center pedestal
  2. Hoist operator’s is mounted on the back of the rescue hoist control panel
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the usable length of the hoist cable?

A

250 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the maximum operating load for the hoist?

A

600 lbs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

T/F - When pulling the survivor into the helicopter, the easiest method is to turn the survivor’s back to the helicopter and pull in.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What should you do if the hoist OVERTEMP light comes on during hoist operations?

A

Terminate hoist operations as soon as possible, allowing the hoist to cool until the OVERTEMP light extinguishes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the maximum allowable load on the hoist when the speed mode switch is in the HIGH position?

A

300 lbs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly