highway design process and TIN surfaces Flashcards
1
Q
different views
A
2
Q
what is a TIN surface
A
3
Q
steps 1-6
A
- origin/destination choice
- gather data, including:
- topography
- weather
- design speed - route analysis
- feasability study - select preffered route
- preliminary design - set hz allignment
- find elevations of existing ground at centerline
4
Q
steps 7-10
A
- draw centerline of existing ground
- design profile of new road
- define the typical cross section template (assembly)
- get x-sctns of existing ground (EG)
5
Q
steps 11-16
A
- combine hz, vert, typical section, EG (corriror)
- calculate earthworks every 20m station (cut and fill)
- plot mass-haul diagram
- are earthworks ok?
yes - step 15
no - step 8 (solid arrow), and possibly step 5 (dotted arrow) - estimate quantities and prepare contract drawings
- TENDERING and CONSTRUCTION