HARD QUESTIONS Flashcards
A hospitality project team is considering LEED certification under LEED O+M. Which of the following credits must the project implement in order to earn LEED Platinum level certification?
Choose 3
- SS Prerequisite Site Management Policy
- EA Prerequisite Building-Level Energy Metering
- EQ Prerequisite Green Cleaning Policy
A project building is seeking credit for the efficiency of the District Energy System (DES) under EA Credit Optimize Energy Performance. Which of the following should be true with the commissioning scope if the project plans to earn EA Credit Ongoing Commissioning?
Choose 2
- All downstream equipment within a district energy system or DES is included in the scope
- All upstream equipment associated with serving the project building is included in the scope
A project decides to provide increased filtration and increased ventilation to earn EQ credit Enhanced IEQ Strategies. Which of the following credits may have a negative impact due to increased filtration and increased ventilation?
Choose 2
- EA Credit Optimize Energy Performance
- EA Prerequisite Minimum Energy Performance
A project generates 1.5% energy on-site through PV panels and plans to purchase carbon offsets for 100% of the natural gas consumption and electricity consumption. How many points will the project earn under EA Credit: Renewable Energy and Carbon Offsets?
1.5% / 1.5% + 100% / 25% = 5
A project has confirmed natural ventilation effectiveness using the CIBSE reference standard. Which of the following data is required by the project to perform natural ventilation procedure using ASHRAE 62.1-2010?
Choose 3
- Ceiling heights
- Location of natural ventilation openings
- Size of the natural ventilation openings
A project IAQ manager for an existing building office project has prepared an IAQ management program based on I-BEAM. The team is ready to conduct the I-BEAM audit. Which of the following areas should the I-BEAM audit be recorded for?
Choose 3
- Mechanical systems
- Occupied spaces
- Builing exterior
A project in Oklahoma is analyzing various credits for exemplary performance. Which of the following credits would qualify for the project to earn an exemplary performance point under IN Credit Innovation option 3 Additional Strategies?
Choose 2
- LT Credit Alternative Transportation
- EA Credit Renewable Energy and carbon offsets
A project is planning to implement EA Credit Demand Response. Which of the following strategies qualify for demand reduction strategies during a DR event? Choose 3
- Global temperature adjustments increase cooling setpoints OR decrease heating setpoints
- Reschedule housekeeping activities, such as dishwashing
- Turning off decorative features, like fountains and video display
A project is planning to use bio-fuel based renewable energy system. Which of the bio-fuels are NOT ELIGIBLE for EA Credit Renewable Energy Production?
Choose 2
- Forestry biomass waste, other than mill residue
- Pressure treated lumber
A project is planning to utilize renewable energy generated from a PV array and wind turbine, not owned by the project owner but a third party. Which of the following statements must be true for the project to earn A Credit Renewable Energy Production?
Choose 2
- The project must have a purchase agreement with 3rd party that last for at least 10 years
- The project owner must retain all environmental benefits from the renewable energy produced off-site through the 3rd party
A project is planning to utilize renewable energy to earn EA Credit Renewable Energy Production. Which of the following systems would qualify as renewable energy to meet the credit requirements?
Choose 3
- Geothermal energy fro subterranean steam or hot water
- Biofuel from combustion of mill residue
- Heat produced from a boiler that uses biofuel
A project is pursuing option 2 - Certified Cleaning Services for EQ Prerequisite: Green Cleaning Policy. Which of the following are required to be completed by the project to comply with credit requirements using option 2?
Choose 3
***- Determine whether the vendor is certified by one of the approved third parties
- The selected vendor must develop a plan for reduced water, energy, and toxic chemical use
- An audit of the vendor’s certification must be completed within 12 months of the performance period***
A project is ready to conduct the custodial effectiveness assessment. Who among maybe the audit personnel?
Choose 2
- 2 individuals associated with the building management trained in APPA guidelines
- Independent third party
_A project must establish storage locations for which of the following items as part of the solid waste management policy?
Choose 2_
- Hazardous waste
- Recyclable materials
A project not eligible for Energy Star Rating may use which of the following to benchmark the building’s energy performance to comply with EA Prerequisite: Minimum Energy Performance?
Choose 2
- Comparisons with national source energy data or similar comparable buildings
- Project building’s historical energy use
_A project opted for option 2 - Certified IPM Service. Which of the following must be submitted as documentation to earn EQ Credit Integrated Pest Management?
Choose 2_
- IPM tracking tool
- GreenPro, EcoWise, or GreenShield certificate
A project pursuing LEED O+M certification has spaces that employ natural ventilation and mixed-mode systems when the mechanical ventilation is inactivated. Which of the following must the project do to comply with EQ prerequisite: Minimum IAQ performance?
Choose 2
- Determine the minimum outdoor air opening and space configuration requirements using the natural ventilation procedure
- Projects should confirm that natural ventilation is an effective strategy for the project by following the flow diagram in the CIBSE Applications Manual
A project that is not eligible to earn Energy Star rating may choose which of the following as baseline for energy performance to comply with EA Prerequisite: Minimum Energy Performance?
Choose 2
- National average data for similar buildings
- Project Building’s Historical Data
A project that was certified under BD+C is pursuing LEED EB O+M certification after 3 years of building occupancy. The team is pursuing EA Credit Advanced Energy Metering. Which of the following may be used to establish baseline consumption and demand data?
Choose 2
- A calibrated energy model
- 12 months of historical energy and demand measurements
A project using automated scrubbing machines should comply with which of the following?
Choose 2
- It should be equipped with variable-speed feed pumps
- It should have on-board chemical metering or dilution control systems for chemical refilling
A project with natural ventilation pursuing option 2 under EQ Credit: Enhanced Indoor Air Quality Strategies may choose which of the following strategies to improve IAQ to earn a point?
Choose 2
***- Alarmed openings
- Carbon-dioxide monitoring***
_A project with naturally ventilated spaces will need to include a mechanical ventilation system as a backup under which of the following circumstance?
Choose 3_
***- When the natural ventilation openings are not permanently open
- The naturally ventilated zone is served by heating or cooling equipment
- When the natural ventilation openings include controls that allow for closing during occupied hours***
A project’s Energy Star score is 74. Which of the following should the project do to comply with EA Prerequisite: Minimum Energy Performance?
Choose 2
***- Use the results of the energy audit to determine the areas of greatest opportunity to improve performance
- Start with the no/low cost items found in the energy audit to improve the Energy Star score***
A retail project pursuing certification under LEED O+M may choose which of the following options for environmentally responsible sourcing to meet the requirements of MR Prerequisite: Ongoing Purchasing & Waste Policy?
- Supply Chain Education Program for Retail Employees
- Establish a Supply Chain Environmental Criteria List
- Establish a Supply Chain Survey
- Sustainable Purchasing Education for Customers
- All of the above
A retail project pursuing LEED O+M certification should take which of the following actions to prevent or minimize occupant exposure to environmental tobacco smoke?
Choose 2
- Post signage indicating the no-smoking policy within 10 feet (3 meters) of all building entrances
- Prohibit smoking inside the building
_A school pursuing WE Credit Cooling Tower Water use. In addition to attaining a minimum number of Cooling Tower Cycles, what mimimum percentage requirement for recycled non-potable water use to earn 3 points?_
20%
An office building operation team had completed a Level I walk through within the last 2 years. The team is now preparing a report to comply EA Prerequisite Energy Efficiency Best Management Practices. Which of the following should report address?
Choose 3
- The report should include low-cost improvement opportunities that will improve operations and save energy
- The report should include Current Energy Cost Index, Energy Demand Index, Energy Use Index, and reduction goals
- The report should include comparison of project building with similar building types
At a minimum, which systems must a BAS monitor?
Choose 2
- Lighting
- Ventilation
Determining major energy end uses is part of which of the following credits?
Choose 2
- EA Credit: Existing Building Commissioning-Analysis*
- EA Prerequisite: Energy Efficient Best Management Practices*