Group 5 Flashcards

1
Q

You have configured the system so that inspection lots are created for delivery items automatically. What does the system do if no results for the inspection lot have been recorded yet, and you change the material quantity in the delivery item?

A

Change the quantity of the current inspection lot.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What master data can you integrate into a task list for a production order?

A

Master inspection characteristics (MIC)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which object must combined in test scheduling in the stability study?

There are 3 correct answers to this question.

A

Strategy

Inspection plans

Initial sample

Strategy is the right answer if other option are Physical Drawing Sample and Physical Sample…. If those are not options, the correct answer is SAMPLES

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What causes the system to issue a message to prevent you from closing a notification?

A

Open tasks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

You have assigned a dynamic modification level to an inspection plan. Which dynamic modification criterion is predefined and not editable?

A

Customer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

When you plan an audit for which component can you define partners?
There are 2 correct answers to this question.

A

Audit

CAPA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Where do you define the procedure for the calculation of the quality score at usage decision?

A

Inspection type settings in the material master

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

You want to block purchasing of a material from a supplier due to quality reasons. In which business object would you do this?

A

Quality info record: Procurement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

In which business object do you set whether the supplier must provide a quality certificate and the type of quality certificate that is required?

A

Material Master

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

You want to complete a quality notification, but an error message appears during the status check. What could be the cause?

A

Open Tasks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

When an inspection plan includes multiple group counter, what determines the unit of measure?

A

Usage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is required in inspection planning to transfer a characteristic value from results recording of inspection lot processing?

A

Master inspection characteristic linked to class characteristics

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Which QM master data must you maintain to separate a sample into a primary and reserve sample?

A

Sample drawing procedure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What process can be triggered depending on the customizing settings of the defect class?

A

Creation of a default task in the quality notification

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Which customizing settings are mandatory for defects recording with inspection lots?

There are 2 correct answers to this question.

A

Define the report type

Assign a notification type to an inspection type.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

In nonconformance management, you can create defects of different defects categories. Which types of defects can be created using standard SAP Fiori apps?

There are 3 correct answers to this question

A

Customer defect

Supplier defect

Production defect

17
Q

Which objects can be used as a reference when dependent characteristics specifications are created?

There are 3 correct answers to this question.

A

Combination of material and customer

Material

Combination of material and supplier

18
Q

Which of the following SAP Fiori apps can be used for recording inspection results?

There are 3 correct answers to this question.

A

Record Inspection Results

Manage Inspection Lots

Quality Technician Overview

(RMQ)

18
Q

Which process step can automatically create a quality notification?

A

Characteristics result recording

19
Q

Your customer plan to use Test Equipment Management as part of QM. What event triggers the creation of an inspection lot for calibration inspection?

A

Scheduling a maintenance plan