You have configured the system so that inspection lots are created for delivery items automatically. What does the system do if no results for the inspection lot have been recorded yet, and you change the material quantity in the delivery item?
Change the quantity of the current inspection lot.
What master data can you integrate into a task list for a production order?
Master inspection characteristics (MIC)
Which object must combined in test scheduling in the stability study?
There are 3 correct answers to this question.
Strategy
Inspection plans
Initial sample
Strategy is the right answer if other option are Physical Drawing Sample and Physical Sample…. If those are not options, the correct answer is SAMPLES
What causes the system to issue a message to prevent you from closing a notification?
Open tasks
You have assigned a dynamic modification level to an inspection plan. Which dynamic modification criterion is predefined and not editable?
Customer
When you plan an audit for which component can you define partners?
There are 2 correct answers to this question.
Audit
CAPA
Where do you define the procedure for the calculation of the quality score at usage decision?
Inspection type settings in the material master
You want to block purchasing of a material from a supplier due to quality reasons. In which business object would you do this?
Quality info record: Procurement
In which business object do you set whether the supplier must provide a quality certificate and the type of quality certificate that is required?
Material Master
You want to complete a quality notification, but an error message appears during the status check. What could be the cause?
Open Tasks
When an inspection plan includes multiple group counter, what determines the unit of measure?
Usage
What is required in inspection planning to transfer a characteristic value from results recording of inspection lot processing?
Master inspection characteristic linked to class characteristics
Which QM master data must you maintain to separate a sample into a primary and reserve sample?
Sample drawing procedure
What process can be triggered depending on the customizing settings of the defect class?
Creation of a default task in the quality notification
Which customizing settings are mandatory for defects recording with inspection lots?
There are 2 correct answers to this question.
Define the report type
Assign a notification type to an inspection type.