Group 2 Flashcards

1
Q

You must assign a certificate profile for outgoing certificates to a key combination. What key combination can be used without additional settings?

A

Material, Customer, Material Group

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

You create a supplier claim notification with reference to material document year, number and item from a goods receipt for the PO. What information is copied to the notification?

There are 3 correct answers to this question.

A

Quantity and unit

Material number

Purchasing document number and item

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which inspection origin creates only unplanned physical samples?

A

15 sample management

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How does the system handle equipment and functional locations in an inspection lot in calibration inspection?

A

As a inspection point

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Which objects can be selected with the Manage Defects SAP Fiori app?

There are 3 correct answers to this question.

A

Production defects

Generic defects

Notification items

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Your customer record defects in a characteristic level with in result recording and wants to correct all defects for each inspection. How do you satisfy the customer requirement?

A

Activate defect recording in the control indicators of the characteristics used in the inspection plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Which type of inspection point exist in the system?

There are 3 correct answers to this question.

A

Inspection point for Physical sample

Inspection point for equipment

Inspection point for functional location

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How many times can you execute the Specify Storage Conditions task step in a stability study?

A

An infinite number of times

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

You create a goods receipt inspection lot but the supplier has not provided the quality certificate. Which of the following process steps is possible?

There are 2 correct answers to this question.

A

Posting of the goods receipt

Recording of inspection results

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Which of the following SAP Fiori apps can be used for the usage decisions at the end of inspection lot processing?

There are 2 correct answers to this question.

A

Quality Engineer Overview

Manage Usage Decisions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

A regular inspection of the production resource/tool (PRT) is required. Which type of PRT must be used?

A

Production resources and tools

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Which QM master data must you maintain to plan a primary sample and a reserve sample?

A

Sample-drawing procedure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The assignment of a material master and plant in the inspection plan header is mandatory. What additional data can be assigned to an inspection plan header?

There are 2 correct answers to this question.

A

Customer

Supplier

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

During an in process inspection for production orders, such as inspection type 09, which inventory posting is possible?

A

Quality stock

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Your business requires triggers for inspection lot creation in production. Which of the following events can trigger creation of an inspection lot?

There are 2 correct answers to this question.

A

Production order release

Goods movements for production order

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

During the creation of an inspection lot which quality management master data automatically trigger Physical sample documents?

A

Sample drawing procedure

16
Q

Which of the following physical sample categories can you create from a primary sample?

There are 2 correct answers to this question.

A

Pool sample

Reserve sample

17
Q

Your customer wants to automatically valuate the overall results of an audit using the standard valuation method. Which book scores for the overall result?

There are 2 correct answers to this question.

A

Quantitative valuation

Qualitative valuation

18
Q

The quality inspector check the receipt of incoming certificates in the future, they want to manage the inbox for quality certificates independently for goods receipts. What do you activate to fulfil this requirement?

A

Enhanced certificate processing in the certificate type.

19
Q

During the production inspection, which elements does the system use to determine the layout of defects recording?

There are 3 correct answers to this question.

A

Report type

Catalog profile

Status profile

RCS**