General Topics Flashcards
What’s are the stages in the RIBA Plan of work 2020
Stage 0 - Strategic Definition Stage 1 - Preparation and Briefing Stage 2 - Concept Design Stage 3 - Spatial Co-ordinated Stage 4 - Technical Design Stage 5 - Manufacturing and Construction Stage 6 - Handover Stage 7 - Use
What is the aim of stage 0 in RIBA plan of works
Working out the best means of meeting client requirements
What is the aim of stage 1 in RIBA plan of works
Project brief approved and confirmed it can be accommodated on site
What is the aim of stage 2 in RIBA plan of works
Architectural concept approved by client and aligned to project brief
What is the aim of stage 3 in RIBA plan of works
Architectural and engineering information spatially co-ordinated
What is the aim of stage 4 in RIBA plan of works
All design information required to manufacture and construct project is completed
What is the aim of stage 5 in RIBA plan of works
Manufacturing, Construction and Commissioning Completed
What is the aim of stage 6 in RIBA plan of works
Building handed over, aftercare initiated and building contract concluded
What is the aim of stage 7 in RIBA plan of works
Building used, operated and manufactured efficiently
Name 5 of the 15 Building regulations
A - Structure
B - Fire Strategy
C - Site preparation and resistance to contamination and moisture
D - Toxic Structures
E - Resistance to sound
F - Ventilation
G - Sanitation, hot water and water efficiency
H - Drainage and waste disposal
J - Combustion appliances and fuel storage
K - Protection from falling, collision and impact
L - Conservation of fuel and power
M - Access to and use of the building
P - Electrical Safety
Q - Security in dwelling
R - High speed electronic communication network
What was building regulation N and why was it removed?
N was Glazing safety and was subsumed within K in April 2012
What are Building Regulations?
Building regulations are a set standard instruments for the design and construction of buildings to ensure the safety and health for people in or about those buildings.
Under JCT is COVID-19 a relevant event or relevant matter?
Relevant event under Force Majeure meaning they can claim and EOT but not Additional costs through a Loss & Expense.