General Knowledge Flashcards
Minimum fuel on board for towing
5000 lb
Where can a list of approved tugs be found?
AOM 12.17.2
Where is the location of the ELT’s?
Above the door inside the baggage compartment
What two types of circuit breakers are used on the Global 6000
Thermal and virtual
What is the minimum battery voltage to start the APU?
22V
From which DC bus does each display unit receive its power
DU1 - DC Essential
DU2 - BATT Buss
DU3 - DC Bus 1
DU4 - DC Bus 2
What is the minimum oil level to start the APU?
4.5 quarts.
List the five things that occur during the fire test.
3 fire warning handles light
2 Master Warnings flash
9 CAS Messages appear
2 fire indication on N1
5 aural warnings sound
When will the secondary nav lights come on
During power-up
to test.
Or
When the primary nav light becomes INOP.
DC power carts should be limited to…
1500 amps
If demand is too high, the APU will begin to meter _______ to meet that demand
Bleed air
The APU can power how many ACMPs?
Only one at a time.
If the APU is powering a bus above 37,000, what must also happen?
The associated ACMP must be powered off.
What powers the EMER lights?
They are powered by their own battery packs that are charged by the DC ESS BUS.
Fuel imbalance limits
(all)
Airborne = 1100 lb
Ground = 600 lb
Auto transfer starts at 400 lb
Requirements for Aux tank fuel to be considered useful
500 lb in the AUX tank min
Wing tanks must be full
Flt planned above 30,000
Requirements for AFT tank fuel to be considered usable
500 lb fuel in aft tank
5500 lb fuel in each wing tank
FL planned above 30,000’
Will the auto throttles work when using N1 for power
No
When operating the pacs in the manual mode, maintain output temps in what range
5°C to 60°C
When is TOPI active
80 IAS - 400’ AGL
When is LOPI active
200’ AGL to 50 its.
Max difference between GNSS positions.
0.02 NM
Minimum pressure setting for a huffer cart
40 psi
How is an external DC card connected to the Aircraft electrical system?
The APU Start Contactor Assembly (ASCA) checks the DC parameters before connecting it to the APU BATT DIRECT BUSS