A portion of the wall which projects on one or both sides and acts as a vertical beam, a column, or both
A. Pier
B. Pilaster
C. Balcony
D. Gallery
B. Pilaster
Vertical opening through building for elevators, dumbwaiters, mechanical equipment or similar purposes
A. Aperture wall
B. Window
C. Shaft
D. Fire exit
C. Shaft
The vertical supports, such as posts or stanchions, as used in indigenous or traditional type of construction.
A. Suportales
B. Structural frame
C. Pier
D. Foundation
A. Suportales
Pie de gallos in english
A. Cross bracing
B. Knee braces
C. Rebar
D. Metal sheet
B. Knee braces
The estimated cost to replace the building in kind, based on current replacement costs.
A. Vault
B. Treasure
C. Value
D. Price
C. Value
The enclosing wall of an iron or steel framework or the non bearing portion of an enclosing wall between piers.
A. Curtain wall
B. Dead wall
C. Bearing wall
D. Cross wall
A. Curtain wall
Bonus
B. Dead wall- wall without openings
C. Bearing wall- supports load
D. Cross wall- synonymous with a partition
A wall in which facing and backing are so bonded together that they act as composite element and exert a common action under load.
A. Faced wall
B. Foundation wall
C. Part wall
D. Retaining wall
A. Faced wall
A projecting window similar to bay window, but carried on brackets or corbels
A. Awning window
B. Casement window
C. Sliding window
D. Oriel window
D. Oriel window
Which of these is not a power and function of the secretary?
A. Evaluate existing reference codes
B. Conduct seminar/ workshops on the code
C. Prescribe fees
D. Appoint building official
B. Conduct seminars/workshop - Technical staffs’ function
Which of these is not a duty of a building official?
A. Issue additional rules in the form of memorandum circular
B. Enforcement of provisions
C. Declare ruinous building
D. Non issuance of permit upon evaluation
A. Issue additional rules in the for of memorandum circular (Secretary’s function)
Exempted in building permit fees
A. Building official
B. Secretary
C. Indigenous family dwelling
D. A and B
C. Indigenous family dwelling
Other infos:
Constructed of native materials
Not to exceed 15k
Unauthorized change in submitted plans during construction is in what level of violation?
A. Light violation
B. Less grave violation
C. Medium grave violation
D. Grave violation
D. Grave violation (10k penalty)
The building permit is null and void if not accompanied by the ___?
A. Ancillary Permits
B. Tax declaration
C. Dti Permit
D. Real property tax receipt
A. Ancillary Permit
Which of these does not require building permit for construction?
A. 7sqm Greenhouse
B. Addition of 40sqm terraces for private use of the owner
C. Garden pool with 500mm depth exclusively for private use
D. Garden walls with 1.5m height
Answer: C. Garden pool with 500mm depth exclusively for private use
A. 7sqm Greenhouse (limit is 6sqm only)
B. Addition of 40sqm terraces for private use of the owner (limit is 20sqm only)
C. Garden pool with 500mm depth exclusively for private use
D. Garden walls with 1.5m height (limit is 1.2m only)
In case the applicant of building permit is not the owner, he/she is required to submit an additional document. What document is this?
A. Notarized copy of Contract of Lease
B. Deed of Absolute Sale
C. Current Real Property Tax Receipt
D. A and B
D. Contract of Lease Or Deed of Absolute Sale
Building Permit Application
What radius kilometer is required for vicinity map if the building is commercial, industrial and institutional?
A. 5km rad
B. 4 km rad
C. 3 km rad
D. 2 km rad
D. 2km rad
Building Permit Application
What radius kilometer is required for vicinity map if the building is residential?
A. 2 km rad
B. 1.5 km rad
C. 1 km rad
D. 0.5 km rad
D. 0.5 km rad
The building official shall within ___ days from payment of the required fee, issue the building permit.
A. 30
B. 20
C. 15 a
D. 10
C. 15
The building official may issue a ground and excavation permit even while the building permit application is still being processed subject to payment of the corresponding fees.
A. True, with cashbond of 50kpesos for the 1st 50 cubic meter and 300pesos for every cu m in excess 50 cu m.
B. True, but said excavation shall not exceed 100 cu. m
C. A and B
D. False, excavation is not allowed without building permit.
C. A and B
After 120 days of excavation left open, the cashbond shall be ___?
A. Returned
B. Forfeited
C. Reimbursed
D. Refunded
B. Forfeited
The architect or engineer is liable for damages within 15 yrs from completion of the building is under what law?
A. Article 1732 of the Civil Code of the Philippines
B. Architecture Act of 2004
C. Article 1723 of the Civil Code of the Philippines
D. National Building Code of The Philippines
C. Article 1723 of the Civil Code of the Philippines
In less than 10 days the ___ should be notified before excavation begin
A. Owner
B. Building Official
C. Architect
D. Engineer
A. Owner
Upon completion of construction, the ___ shall submit the logbook duly signed and sealed to the BO including as built plans and other documents.
A. Architect of record
B. Architect in charge of construction
C. Owner
D. Engineer
C. Owner
No building shall be used until the BO has issued a ____?
A. Certificate of true copy
B. Certificate of Occupancy
C. Certificate of Residency
D. Transfer Certificate of Title
B. Certificate of Occupancy
Building Permit Sign dimension for residential buildings
A. 1m x 1m
B. 0.9m x 0.6m
C. 0.8m x 0.4m
D. 1.2m x 0.6m
B. 0.9m x 0.6m
Building permit sign informations. Which of these is not included?
A. Date issued
B. Design Proffesional’s Name
C. Proffesional Incharge of Fulltime Inspection
D. Building Official
D. Building Official
Building permit expire and become null and void if the building authorized therein is not commenced within a period of ___ after the issuance
A. 120 days
B. 1 yr
C. 200 days
D. 150 days
B. 1 yr
A partial certificate of occupancy may be issued prior to the completion of the entire building.
A. True
B. False
A. True
Shall be 4 hr fire resistive throughout and the structural elements shall be of steel, iron, concrete, masonry construction
A. Type V
B. Type IV
C. Type III
D. Type II
A. Type V
Types of construction
Shall be of masonry and wood construction. The building shall be one hour fire resistive throughout.
A. Type II
B. Type I
C. Type III
D. Type V
C. Type III
Type of Construction
Shall be wood construction with protective fire resistant materials and one hour fire resistive throughout
A. Type III
B. Type I
C. Type II
D. Type Iv
C. Type II
Materials required to be flame spread proofed shall be treated with a flame retardant having a flame spread of __ or less as determined by the tunnel test.
A. 10
B. 30
C. 50
D. 60
C. 50
Changes, alterations and repairs in fire zone may be made provided that in any 12 month period of the work does not exceed ___ of the value of the existing building
A. 30%
B. 20%
C. 25%
D. 35%
B. 20%
___ means the degree to which a material can withstand fire as determined by generally recognized and accepted testing methods.
A. Incombustible
B. Fire resistive rating
C. Fire restricted
D. Fire zone
B. Fire resistive rating
The quality of the drinking water from meteoric, surface or underground sources shall conform to the criteria set in the latest approved ___?
A. National standards for drinking water standards
B. National waterworks and sewerage system authority standards
C. Maynilad standards
D. Metropolitan waterworks and sewerage system system
A
Rainwater drainage shall not discharge to the sanitary sewer system
A. True
B. False
A. True
Footings located at least 2.4m below grade along national roads or public highway may project not more than ___
A. 500mm
B. 200mm
C. 300mm
D. 400mm
C. 300mm
Total projection allowed in a lot with 12m width streets
A. 0.60m
B. 1.5m
C. 0,9m
D. 1.3m
D. 1.3m
Total projection allowed in a lot with 3m width streets
A. 0.60m
B. 1.5m
C. 0,9m
D. 1.3m
A. 0.6m
Total projection allowed in a lot with 14m width streets
A. 0.60m
B. 1.5m
C. 0,9m
D. 1.3m
D. 1.5m
Total projection allowed in a lot with 6m width streets
A. 0.60m
B. 1.5m
C. 0.9m
D. 1.3m
C. 0.9m
The clearance between the established grade of the street and the lowest under surface of any part of the balcony projection over street shall not be less than ___
A. 2.7m
B. 2.0m
C. 3m
D. 1.8m
C. 3m (eto rin clearance sa arcaded and canopy)