FLOWS AND PROFILES Flashcards
1
Q
- Flight Deck Equipment Flow: S-AML/Forms/Manuals/Documents; F-Flight Deck Door. (normally by FO, 1st flight of the day or A/C change).
A
- S-AML/Forms/Manuals/Documents
- L/G Lever
- PBE
- Halon Fire Ext
- Crash Axe
- CA life vest
- Spare EFB Mount (ERJ-170)
- CBs
- Company provided EFB Mount
- CA Escape rope
- FO Escape rope
- Company provided EFB Mount
- CBs
- Spare EFB Mount (175)
- FO & JS life vests
- Safety pins
- Flight deck Door
2
Q
- CAs Flight deck preparation Flow: Checking everything S-AML; F-QRH. (Accomplished every flight).
A
- AML
- Parking brake- on
- FMS initialization-set
- O2 and interphone- check1
- DVDR CONTROL Panel - Test1
- ELECTRIC Panel - Set
- COCKPIT LIGHTS Panel - Set
- FUEL Panel - Check
- PASSENGER SIGNS Panel - Set
- FIRE EXTINGUISHER Panel - Check1
- APU CONTROL Panel - Set
- WINDSHIELD WIPERS - OFF
- EXTERNAL LIGHTS Panel - Set
- HYDRAULIC Panel - Set
- PRESSURIZATION Panel - Set
- WINDSHIELD HEATING - In
- ICE PROTECTION Panel - Set
- AIR COND / PNEUMATIC Panel - Set
- PASSENGER OXYGEN Panel - Set
- STANDBY COMPASS - Check
- GLARESHIELD LIGHTS CONTROL Panel - Set (as required)
- REVERSIONARY Panel - Check
- PFD - Check
- MFD - Check
- IESS - Check and Set
- GND PROX TERR INHIB - Out
- EICAS - Check
- CLOCK - Set
- LANDING GEAR LEVER - DN
- ELT - ARM
- GND PROX G/S INHIB - Out
- LG WRN INHIB - Guarded
- FLIGHT CONTROLS MODE Panel - Check
- STALL WARNING Panel - Check
- POWERPLANT Panel - Check
- EICAS FULL - Out
- SPEED BRAKE LEVER - CLOSE
- THRUST LEVERS - IDLE
- RAT MANUAL DEPLOY Handle - Stowed
- ACP - Checked
- GND PROX FLAP OVRD - Guarded
- SLAT/FLAP Lever - Verify Outside Position
- TRIM Panel - Check1
- COCKPIT DOOR CONTROL Panel - Check
- ELEVATOR DISCONNECT - In and No EICAS
- AILERON DISCONNECT - In and No EICAS
- QRH-Installed
3
Q
FO Flight deck preparation Flow: Checking everything S-AML; F-QRH. (Accomplished every flight).
A
- AML, Forms, Manuals, and Documents - Check
-FMS Initialization - Set - Glareshield Light Control Panel - Set (as required)
- O, and Interphone - Check
- REVERSIONARY PANEL - Check
- ADS Probes Heater - Set (as required)
- PFD - Check
- MFD - Check
- ACP - Check
- QRH-Installed
- Alt Gear Extension - Check1
- Pitch Trim - Check’
4
Q
Engine Failure after V1
A
PM: “Positive Rate”
PF: “Gear up”
PF: “HDG, Bank”
PF: “FLCH, VFS”
PF: “Flaps 1”
PF: “Flaps up”
PM: “Flaps up”
PF: “Continuous, Bank” Eng failure checklist.