first 50 Flashcards

1
Q

What would be the most appropriate
means for the contractor to communicate to
the project owner an unforeseen condition
not identified in the soils report?
A. Document the issue in the job diary
B. Issue a jobsite memorandum
C. Draft a construction report
D. Write a formal business letter

A

d

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When is the best time to distribute the
working agenda to the participants of a
meeting?
A. As a follow-up to the meeting
B. At the beginning of the meeting
C. About one day after the meeting
D. About one day prior to the meeting

A

d

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The contractor has tasked his project
engineer with developing an agenda for a
preconstruction meeting with the architect
and owner. The project engineer has
received numerous emails and RFIs from
subcontractors and vendors requesting a
wide range of information. Which
document is most appropriate to distinguish
between appropriate topics for the
meeting and topics better addressed
through other means?
A. General conditions
B. General requirements
C. Technical specifications
D. Supplementary conditions

A

b

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the best time to distribute the
meeting minutes to the participants?
A. At the beginning of the meeting
B. About one day after the meeting
C. About one hour prior to the meeting
D. About one day prior to the meeting

A

b

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Which of the following statements is true
about the use of texting as a means of
communicating in the construction industry?
A. A means of easily and effectively
documenting communication
B. Appropriate for clarifying but not for
formal direction
C. Should be completely avoided in
construction
D. Acceptable for communication if
specifically allowed in the contract

A

b

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

. A subcontractor identifies a significant
discrepancy between the architectural and
structural drawings. The subcontractor
immediately meets with the general
contractor at their construction trailer to
discuss the discrepancy. The general
contractor agrees that this could be a
significant change depending on which of
the drawings describes the designer’s
intent. Which of the following actions is the
most appropriate in this situation?
A. Draft a change order proposal and
arrange a meeting with the design
team and owner to resolve the conflict.
B. Draft an RFI that describes the
discrepancy in detail and submit it to
the architect immediately.
C. Send a short text alerting the design
team of the issue and discuss the
discrepancy in detail at the next
meeting.
D. Email the engineer of record to collect
relevant background information and
follow up w

A

b

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  1. What are the leadership skills needed to
    conduct a productive meeting?
    A. Planning, probing questions,
    responding critically, and decision
    making
    B. Planning, timing, coordinating, probing,
    responding critically, and following up
    C. Listening attentively, responding
    constructively, soliciting all ideas, and
    matching decision making to the
    situation
    D. Coordinating, listening selectively,
    responding critically, soliciting
    supportive ideas, and adjusting
    decision making to the situation
A

c

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

. Which of the following statements made
by the indicated parties below would least
likely be made at an
owner/architect/contractor progress
meeting?
A. Contractor: “There are 14 unanswered
RFIs on the log.”
B. Superintendent: “A third party
inspector will assist the supervision of
the roofing installation.”
C. Owner: “It is very likely, that change
order proposal #23 will be accepted.”
D. Project manager: “The bond rate for
ABC subcontractor is 1.45%”

A

d

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is a listener’s retention percentage
of an oral conversation?
A. 10%
B. 50%
C. 60%
D. 90%

A

a

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Which of the following communication
methods is the most effective way to know
that the communication has been
understood?
A. The sender should ask closed-ended
questions and tell the receiver twice.
B. The sender should ask open-ended
questions and make them speak.
C. The sender should ask how they feel
and their attitude toward the activity.
D. The sender should tell them what to do
and get them back to work quickly.

A

b

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Which of the following is the best example
of an open-ended question?
A. Do you understand what work is
supposed to be completed?
B. Do you know which shovel to get me
from the tool shed?
C. What steps are you going to take to
complete the activity?
D. How do you feel about completing the
activities assigned?
ENGINEERING CONCEPTS

A

c

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Which of the following statements about
the following organizations and their
justifications of its use is most appropriate
when designers develop project
specifications?
A. Organize building materials by
International Building Code chapters to
facilitate inspections by the authority
having jurisdiction.
B. Only use materials tested by
Underwriters Laboratories to ensure
the highest quality and lowest flame
spread rating.
C. Use the Construction Specification
Institute’s organizational system for
categorizing construction materials into
divisions and sections as it is widely
used by the industry.
D. Use products endorsed by the
American Society for Testing Materials
to prevent the likelihood of structural
failure.

A

c

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Assume you have a simple beam 16 ft long
supported on each end by R1 and R2.
There is a concentrated load of 900 lb
that is 4 ft from R2. Reaction R1 is pinned
12 ft from the load. Reaction R1 is 225 lb
and R2 is 675 lb. What is the maximum
bending moment in pounds per foot?
A. 900
B. 1,800
C. 2,700
D. 3,600

A

c 225x12=2700

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Assume that you are pouring a wall that is
151 ft 4 in. long, 14 ft high and, 1 ft 4 in.
thick. The crew’s daily placement rate is
375 cy per 8-hr day. How many hours will
it take to complete the wall?
A. 0.3
B. 2.2
C. 27.0
D. 58.8

A

b (151.33x14x1.33ft)x (1cy/27)=104.6
375/8=46.9 cy/hr
104.6/46.9=2.2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Using the average soil weights from the
table in Figure 1, what is the swell
percentage of a loam soil?
A. 8.3%
B. 23.8%
C. 31.9%
D. 81.0%

A

sw% 2600/2100-1x100=23.8
bcy/lcy-1x 100

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Using the psychrometric chart provided in
Figure 2, what is the enthalpy of 2 lb. of
air given a dry bulb temperature of 75º F
and a relative humidity of 50%?
A. 28 BTUs
B. 56 BTUs
C. 108 BTUs
D. 128 BTUs

A

28btu/lb from figure 2
28x2=56

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

An HVAC technician is inspecting an
outside condensing unit of an air source
heat pump in the summer. The unit is
energized and appears to be operating
normally. One of the refrigerant lines is
cool to the touch and insulated. Which of
the following statements is most likely true
about this refrigerant line and the phase of
the refrigerant in it?
A. It is a suction line and the refrigerant is
a gas at a relatively low pressure
B. It is a suction line and the refrigerant is
a liquid at a relatively high pressure
C. It is a liquid line and the refrigerant is
a liquid at a relatively high pressure
D. It is a condensate line and the
refrigerant is a gas at a relatively high
pressure

A

a

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q
  1. Which statement most accurately describes
    how a 3-phase, 120/208V load would be
    wired?
    A. One hot, one neutral and one ground
    conductor
    B. Two hot and one neutral conductor
    C. Three hot and one neutral conductor
    D. Three hot conductors
A

c

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Which fire protection system would be
most appropriate for an unconditioned
warehouse located in Chicago if the
warehouse contains materials such as
paper, wood and other type A
combustibles?
A. Wet pipe system
B. Dry pipe system
C. Deluge system
D. Clean agent system

A

b

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

The owner wants to fast-track a
construction project. Which project delivery
system best supports this process?
A. Partnering
B. Design-bid-build
C. CM agency
D. Design-build

A

d

21
Q

An owner has contracted with an
engineering firm to address a sinkhole that
has developed at the corner of an existing
building. The engineer recommends
pressure grouting the sinkhole at a
minimum of three locations. The engineer
estimates it will require between 100 and
250 cubic yards of grout. The engineer
assists the owner develop the contractors’
bid documents and the scope of work.
Which type of contract would be most
appropriate for this project?
A. Unit price
B. Turnkey
C. Design-bid-build
D. Lump sum

A

a

22
Q

A contract is entered into in which the
owner holds a contract with the architect
and each trade contractor. In addition, the
owner holds a contract with a management
service company to perform the trade
coordination, cost control, and scheduling
services. What is this project delivery
method called?
A. Partnering
B. Joint venture
C. Design-build
D. Construction management

A

d

23
Q

. A successful contractor operating as a sole
proprietor is considering restructuring her
company to reduce her personal risk.
Which of the following would be the most
appropriate action for her to take?
A. Leave the company as a sole
proprietorship and move the company
assets into her personal accounts
B. Create a LLC by filing with the state in
which she lives
C. Create a S corporation by filing with
the IRS
D. Create a C corporation by filing in a
county other than the one she lives in

A

b

24
Q

A project engineer has been tasked with
writing a purchase order for a large steel
package. The owner is a local municipality
and is tax exempt. The project engineer is
employed by a small business enterprise
(SBE) registered with the federal
government. When writing the purchase
order, which law should be reviewed to
ensure the basic rules governing the sale
are complied with?
A. Davis Bacon Act
B. Uniform Commercial Code
C. National Labor Relations Act
D. Uniform Transportation Code

A

b

25
Q

Which graphical measurement tool is a bar
chart that displays a frequency
distribution?
A. Histogram
B. Pareto chart
C. Pie chart
D. Fishbone chart

A

a

26
Q
  1. A contractor submits a bid for a large
    commercial project relying on a bid from a
    steel subcontractor. The contractor is
    awarded the project; however, when
    attempting to award the subcontract, the
    steel subcontractor retracts their bid. The
    next lowest steel bid was 10% higher.
    Which of the following is the most
    appropriate legal argument for the
    contractor to make if seeking restitution?
    A. Consideration intact
    B. Legal purpose established
    C. Promissory estoppel
    D. Equitable adjustment
A

c

27
Q

Using the financial statements provided in
Figures 3a and 3b, calculate the working
capital for this company at the end of the
year?
A. $176,177
B. $733,154
C. $1,463,403
D. $1,633,389

A

b 1,415,815-682661=

28
Q

Using the financial statements provided in
Figures 3a and 3b, calculate the current
ratio?
A. 0.47
B. 1.00
C. 2.07
D. 4.36

A

1415815/682611=2.07

29
Q

Using the financial statements provided in
Figures 3a and 3b, calculate the quick
ratio (acid test)?
A. 0.23
B. 0.48
C. 1.00
D. 2.07

A

260631+423731/682,661=1.00

30
Q

Which piece of equipment and attachment
would be the most efficient method to
excavate inside a cofferdam?
A. Shovel with a 3-cy bucket
B. Backhoe with a 3-cy bucket
C. Crane with a clamshell attachment
D. Crane with an auger attachment

A

c

31
Q

CE TEST ► AC EXAM
31. Which of the following is the most efficient
temporary form system to support freshly
placed concrete poured continually in a
vertical direction?
A. Tilt-up form system
B. Flying form system
C. Lift slab form syste

A

d

32
Q

Which CSI division contains the bidding
requirements for a project?
A. 00
B. 01
C. 01–49
D. 02–49

A

a

33
Q

A junior architect has been tasked with
providing an additional product submittal
requirement to the bid documents before
they are released to the contractors.
Where would the most appropriate place
for the requirement be located?
A. Revised invitation to bidders
B. General conditions in the contract
agreement
C. Part 3 of the applicable section of the
specifications
D. Supplemental conditions in the project
manual

A

c

34
Q

The technical specifications reference
ASHRAE as a publisher of numerous
technical standards. What does the
acronym ASHRAE stand for?
A. American Steel Housing Rating
Association of Engineers
B. Associated Structural Hoists Rating
Association of Engineers
C. American Society for Heating,
Refrigerating and Air Conditioning
Engineers
D. Associated Society for Home Rating Air
Equipment

A

c

35
Q

Select which party is typically responsible
for designing temporary structural
formwork?
A. Owner
B. Engineer of record
C. Contractor/vendor
D. Architect

A

c

36
Q

. Which of the following systems is designed
to carry the total vertical load of a
structure?
A. Piling
B. Cofferdam
C. Timber shoring
D. Cribbing and tiebacks

A

a

37
Q

During a construction project, a contractor
used an area of the site for parking. The
site was originally vegetated with grass
and small bushes before it was cleared for
parking. After it rained, this area was
often muddy causing trucks and equipment
to get stuck. Gravel was put down on two
separate occasions to mitigate this
problem. The parking area is now
scheduled to be built on. Which would be
the most appropriate piece of equipment
to compact the soil?
A. Backhoe
B. Sheepsfoot
C. Smooth wheel roller
D. Wheel tractor scraper

A

c

38
Q

Using only the information provided in
Figure 4, which concrete beam is most
likely to be under the lowest tensile stress?
A. 1B4
B. 1B10
C. 1B3
D. 1B5

A

b

39
Q

Using the information provided in Figure 5,
which of the following is a claim that can
be made?
A. Contractor is to purchase a unit
manufactured by McQuay
B. The unit must have a minimum SEER of
7.5
C. The unit has a cooling capacity under 1
ton
D. The roofing structure will not carry the
dead weight of the unit

A

d

40
Q

Which of the following items would not
typically be included with the instruction to
bidders (ITB) bid document?
A. Insurance requirements
B. Description of the project
C. Subcontractors the prime contractor
proposes to use
D. Date and time the bids are due to the
designer

A

c

41
Q

Which party has the design liability for a
prescriptive specification?
A. Owner
B. Contractor
C. Architect/engineer
D. Code official

A

c

42
Q

The contractor submits a bid for
$1,303,071 with the appropriate forms.
They receive a notice of award letter
indicating that their bid has been selected.
The contractor decides not to accept the
contract. Which of the following statements
is a likely outcome?
A. They will lose the amount of their bond
premium.
B. They will lose the amount of their bid
bond face value.
C. As long as the letter or contract has not
been signed, they can withdraw
without ramifications.
D. They will lose the amount of their
performance bond face value.

A

b

43
Q

Using the bond premium schedule below,
what is the bond premium for a
$2,755,000 project?
First $5,000 = $12.00/$1,000
Next $2M = $6,000 + $7.25/$1,000
Next $2.5M= $20,500 + $5.75/$1,000
A. $19,974
B. $45,373
C. $55,974
D. $66,341

A

b
First 5K = $5,000/1,000 × $12.00 =
$60
• Next 2M = $6,000 +
(2,000,000/1,000) × $7.25 = $20,500
• Next 2.5M = $20,500 + (2,755,000 –
2,005,000)/1,000 × $5.75 = $24,813
• $60 + 20,500 + 24,813 = $45,373

44
Q

The plans call for the contractor to drive,
pull, and salvage steel sheet piling 15 ft
deep. The estimated quantity is 12,000 sq
ft of contact area (SFCA). Given the crew
makeup as shown in Figure 6, an 8-hr
workday, and a crew daily output of 545
SFCA, how many total work hours are
expended per day?
A. 28
B. 32
C. 60
D. 100

A

c 1x8+4x8+2x8+.5x8=60

45
Q

The plans call for the contractor to drive,
pull, and salvage steel sheet piling 15 ft
deep. The estimated quantity is 12,000 sq
ft of contact area (SFCA). Given the crew
makeup as shown in Figure 6, an 8-hr
workday, and a crew daily output of 545
SFCA, what is the productivity rate
expressed in work hours per unit
(Whr/Unit)?
A. 0.059
B. 0.110
C. 9.083
D. 17.031

A

60whr/545sfca=.110

46
Q

Given a rectangular cofferdam that is 60
ft wide × 100 ft long and 10 ft deep and
enclosed with a 3-ft toe, how many total
SFCA are required for the sheet piling?
A. 3,200
B. 4,160
C. 6,000
D. 60,000

A

b
60+100+60+100=320inft
320inftx13=4160sfca

47
Q

Given the information provided in Figure 7
for a rectangular cofferdam that is 60 ft
wide × 100 ft long and 10 ft deep and
enclosed with a 3-ft toe, approximately
how many total board feet (BF) are
needed for all of the cofferdam
components, including waste?
A. 16,164
B. 22,826
C. 25,565
D. 27,229

A

c
* VLF = 320 lnft/(13 in./12 in.) = 296
PCS
* 296 PCS × 13 ft long = 3,848 VLF
* Piling = 3,848 VLF × (3 in. × 13 in.)/12
= 12,506 BF
* Wales = 3 lines × 320 ft = 960 lnft
* 960 lnft × (6 in. × 8 in./12 in.) = 3,840
BF
* Braces = 3 lines × 12 PCS/line × 60 ft
long = 2,160 lnft
* 2,160 lnft × (6 in. × 6 in./12 in.) =
6,480 BF
* Subtotal = 12,506 + 3,840 + 6,480 =
22,826 BF
* Waste = 22,826 BF × 12% = 2,739 BF
* Total board feet = 22,826 + 2,739 =
25,565

48
Q

Using the information provided in Figures
8a and 8b, how many cubic yards of
concrete are needed for the walls
(excluding foundation and slab)?
A. 101
B. 120
C. 135
D. 155

A

A
* Length of wall at centerline: 14.83 ft +
43.83 ft + 30.83 ft + 21.33 ft + 16.00
ft + 22.5 ft = 149.32 ft
* Depth of wall: 207.3 ft – (190.5 ft +
1.17 ft) = 15.63 ft
* Width of wall: 1.17 ft
* Volume: (149.32 ft × 15.63 ft × 1.17
ft)/27 = 101 cy

49
Q

Using the information provided in Figures
8a and 8b, how many bank cubic yards of
soil must be excavated and removed?
Assume the existing grade is 204 ft and
that excavated soil is being used for
backfilling.
A. 40
B. 350
C. 1,070
D. 9,633,601

A

. B
* Shape 1 = 45 ft × 16 ft × 8.75 ft/27 =
233.33 cy
* Shape 2 = 22.5 ft × 16 ft × 8.75 ft/27
= 116.66 cy
* Total = 233.33 + 116.66 = 350 Bcy