🚒 Fire Ground Op Flashcards

1
Q

Making Pump Ready

12 Steps

A
  • Water Tank Full
  • Tank Valve Open
  • Small Line Valve Open
  • Pump Fully Primed
  • All Intake Valves Closed
  • Relief Valve Preset at 160PSI
  • Drain Valves on Intake Open
  • Drain Valves on Discharge Gates Closed
  • Auxillary Cooling Valves Open
  • Priming Pump Oil Tank Filled(Vent Hole Clear)
  • Tank Filled Valve Closed
  • Blind Caps Hand Tight
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Proper leakage rate for pump packings

A

10-20 drops per minute when operating at 100PSI

If rate is less pump will overheat
If rate is more it will make priming the pump difficult

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The series-parallel pump will operate more efficiently in the pressure position when it is supplying small quantities of water,

A

As the desired pressure will be developed at a lower engine speed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Engine pressure for sprinkler systems______ unless otherwise ordered

A

125psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Engine pressure for combination sprinkler/standpipe systems

A

175psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Two pump operation is written so that a pressure of

A

125 psi is used by the pumper at the source of supply (150psi when supplying the hydrant valve)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Hose is tested at

A

200psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Pump operators in a relayed line of more than two pumped with the exception of the operator of the pump nearest the fire:

A

Shall calculate their pump pressure using the relay formula

Engine Pressure=20+Friction Loss+/-Elevation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly