FF Procedures Flashcards

1
Q

Before proceeding above, officer (2nd due truck)must size up conditions, following should be considered?

Ladders 3

A
S.L.L.A.A.C
S-severity of fire
L-location of fire
L-line placement
A-availability of water
A-area of refuge
C-control of fire apartment door
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Transmission of a 10-77?

75 ft or more in height

A
F.W.A.H.N
F-fire visible from exterior
W-wind impacted
A-advance fire on arrival
H-heavy smoke on numerous floors
N-numerous reports of persons in difficulty due to smoke
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

1st due Ladder notifications to IC or Engine Officer (if IC is not on scene)?

A

T.L.C.
T-type of stairs
L-labeled-scissors stairs labeled correctly
C-closest stairwell to fire apt.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

2nd Alarm in Taxpayers?

A

A.C.A.C
A.C.-advanced cellar
A-adjoining occupancy
C-cockloft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

First arriving Ladder (or Engine) obtain as much info as possible from fire safety director or surrogate, as to?

A
S.E.A.L.
S-status of elevators
E-evacuation procedures implemented
A-access stairs serving FIRE FLOOR
L-location of fire
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

OV decision to reassure victim or proceed to Roof to assist with LSR?

Brownstones

A

L.I.E.
L-location and severity of fire
I-immediate vicinity of victim-smoke and fire
E-emotional state of victim

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Vacant Buildings…Interior attack after risk assessment base on :

A
C.A.V.S
C-CURRENT STRUCTURAL STABILITY
A-any KNOWN life hazard
V-verification of safe access to fire area
S-size and location of fire

MOST IMPORTANT FACTOR IS STRUCTURAL STABILITY

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Vacants..size up…general considerations?

A
A.L.E.N
A-any known or indicated presence of life
L-location and extend of fire
E-exposure problems
N-number of units on initial alarm
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Private Dwelling: IC (Chief or Company Officer) should consider ordering an exterior hoseline operated into a CELLAR WINDOW to allow for quick knockdown when there will be DELAY in applying water from the interior or whenever conditions dictate: examples are:

A

S.A.A.L.L.E.

S- secondar cellar entrance (unable to locate)
A- advancing down interior stairs CANNOT be accomplished
A-Advance cellar fire
L-lightweight construction
L-locating ANY cellar entrance cannot be done
E-EMERGeNCY- members trapped / endangered from collapse

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Private Dwellings…Factors precluding the descent of the first hoseline down the interior cellar stairs?

A

H.S.S.

H-High heat at top of stairs
S-stability of stairs are questionable
S-serious fire condition

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Stretching 2 1/2” line at Private Dwelling?

A
W.H.I.F.E.
W-wind impacted 
H-Heavily I-involved first floor in larger style PD (QUEEN ANNE)
F-FULLY involved building
E-exposure protection

Fully Involved- drop 2 handlines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

TaxPayers…

Primary Consideration should be EXTERIOR OPS…when the following is present at Taxpayer with BOWSTRING TRUSS ROOF?

A
V.A.U.L.T.
V-vacant buildings 
A-attic space- bow string trusses found above the ceiling 
U-underside of the roof involved
L-large and/or advanced fires
T-timber trusses involved
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

TaxPayers…

Primary Consideration should be EXTERIOR OPS…when the following is present at Taxpayer with BOWSTRING TRUSS ROOF?

A
V.A.U.L.T.
V-vacant buildings 
A-attic space- bow string trusses found above the ceiling 
U-underside of the roof involved
L-large and/or advanced fires
T-timber trusses involved 

UNDER NO CIRCUMSTANCES shall any member operate ON THE ROOF of any building involved in a content or structural fire with a wooden, metal or combination bowstring truss design (triangular cut/sloping hip section front/rear of the roof from TOWER LADDER)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

PAK TRACKER….Signal Strength affected by?

A
M.O.P.D
M-materials affecting signal in between
O-orientation of the receiver 
P-path signal takes
D-distance
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

PAk Tracker …. Signal will usually pass through?

A
G.L.O.W
G-glass
L-lightweight building materials
O-openings like gaps, holes, stairs, windows, elevator shafts
W-wood
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Signal PAK TRACKER won’t pass through, but will attempt to PASS AROUND, will reflect and/or NOT PENETRATE?

A

M.B.C.
M-metal, structural framework, large metal objects
B-brick
C-concrete block, walls, floors

17
Q

Decisions delegated to NOZZLE TEAM?

A
D.R.O.P.S.C
D-direction of stream (NOT INITIAL)
R-rate of advancement
O-opening in EMERGENCY
P-PARTIAL shutdown to gain control
S-sweeping floor
C-calling for more line
18
Q

TL used for VENTILATION…bring ?

A
H.E.L.P
H-hook -6 feet
E-entry tools/axe and halligan
L-LSR
P-power saw