Facilities Flashcards
Waterway suitability assesment should ber submitted with what.
Letter of Intent (127)
Vapor Control System must be certified by
Certifying Entity
Vapor COntrol System hoses must withstand what vacuum
2.0 psi
How often for 105 drills
3 months
How often for QI exersize
quarterly
Exersizes cannot exceed
18 months (security)
Who must guarantee OSHA training for response workers
employer
Small discharge containment for hoses or pipes with inside diameter of 6 inches or smaller
2 barrels
Small discharge containment for hoses or pipes with inside diameter of more than 6 inches but smaller than 12 inches
3 barrels
Small discharge containment for hoses or pipes with inside diameter of more than 12 inches
4 barrels
Welding/hot work is prohibited during gas freeing operations within ________________of bulk cargo operations involving flammable or combustible materials.
30.5 meters (100 feet)
Welding/hot work is prohibited during fueling operations within ________________of bulk cargo operations involving flammable or combustible materials.
30.5 meters (100 feet)
Welding/hot work is prohibited within ________________of explosives.
30.5 meters (100 feet)
Welding/hot work is prohibited within ________________of HAZMAT.
15.25 meters (50 feet)
How often for deployments exersizes if the facility owns the equipment (154)
2 times per year (semi annually)
How often for deployments exersizes for OSRO owned equipmentequipment (154)
Annually
How often are QI notification exersizes conducted (154)
quarterly
How often must a table top be conducted (154) In a ___________ year period one of these exersizes must include a WCD scenario
annually
3
All components of the response plan must be exersized at least once every _______ years
3
After participating in a n AREA exersize a facility owner/operator will no be reqiuoired to participate in another one for _______ years (154)
6
After partricipating in a COTP directed unannounced drill a facility owner/operator will not be required to participate in another one for ______ years
3
Facility should retain all exersize records for _____ years
3
Who does a facility submit an ASP to
Commandant
Report a TSI to
COTP
Report a security breach to
NRC
Records of Coast Guard inspections are kept for (154)
3 years
What is the maximum duration of a DOS
90 days
DOS for MARSEC level 1 must not exceed
90 days
DOS for MARSEC level 2 must not exceed
30 days
A facility must comply with a MARSEC level change in how many hours
12
If a vessel is moored at a facility during a security drill, the vessel
CANNOT be required to participate in hte drill
What is a COA facility called
Reception
what form is issued to a reception facility that receives oil
COA, Certificate of Adequacy
How long are COAs valid for
5 years
until suspended
until revoked
33CFR158 no longer aplies
minimum design burst pressure for each hose assembly must be at least_______the sum of the pressure relief valve settingplus the static head pressure of the transfer sytem, at the point where the hose is installed.
4 times
Each pressure gaugemust show pressure within______ of the actual pressure
10%