Facilities Flashcards
Waterway suitability assesment should ber submitted with what.
Letter of Intent (127)
Vapor Control System must be certified by
Certifying Entity
Vapor COntrol System hoses must withstand what vacuum
2.0 psi
How often for 105 drills
3 months
How often for QI exersize
quarterly
Exersizes cannot exceed
18 months (security)
Who must guarantee OSHA training for response workers
employer
Small discharge containment for hoses or pipes with inside diameter of 6 inches or smaller
2 barrels
Small discharge containment for hoses or pipes with inside diameter of more than 6 inches but smaller than 12 inches
3 barrels
Small discharge containment for hoses or pipes with inside diameter of more than 12 inches
4 barrels
Welding/hot work is prohibited during gas freeing operations within ________________of bulk cargo operations involving flammable or combustible materials.
30.5 meters (100 feet)
Welding/hot work is prohibited during fueling operations within ________________of bulk cargo operations involving flammable or combustible materials.
30.5 meters (100 feet)
Welding/hot work is prohibited within ________________of explosives.
30.5 meters (100 feet)
Welding/hot work is prohibited within ________________of HAZMAT.
15.25 meters (50 feet)
How often for deployments exersizes if the facility owns the equipment (154)
2 times per year (semi annually)
How often for deployments exersizes for OSRO owned equipmentequipment (154)
Annually
How often are QI notification exersizes conducted (154)
quarterly
How often must a table top be conducted (154) In a ___________ year period one of these exersizes must include a WCD scenario
annually
3
All components of the response plan must be exersized at least once every _______ years
3
After participating in a n AREA exersize a facility owner/operator will no be reqiuoired to participate in another one for _______ years (154)
6
After partricipating in a COTP directed unannounced drill a facility owner/operator will not be required to participate in another one for ______ years
3
Facility should retain all exersize records for _____ years
3
Who does a facility submit an ASP to
Commandant
Report a TSI to
COTP
Report a security breach to
NRC
Records of Coast Guard inspections are kept for (154)
3 years
What is the maximum duration of a DOS
90 days
DOS for MARSEC level 1 must not exceed
90 days
DOS for MARSEC level 2 must not exceed
30 days
A facility must comply with a MARSEC level change in how many hours
12
If a vessel is moored at a facility during a security drill, the vessel
CANNOT be required to participate in hte drill
What is a COA facility called
Reception
what form is issued to a reception facility that receives oil
COA, Certificate of Adequacy
How long are COAs valid for
5 years
until suspended
until revoked
33CFR158 no longer aplies
minimum design burst pressure for each hose assembly must be at least_______the sum of the pressure relief valve settingplus the static head pressure of the transfer sytem, at the point where the hose is installed.
4 times
Each pressure gaugemust show pressure within______ of the actual pressure
10%
small discharge containment for a mobile facility
not less than 5 gallons
In a transfer area, what on a pump is allowed to leak
packing glands
On a designated Waterfront facility what must be kept in adequate numbers and locations
Fire extinguishers
A facility security plan is vaild for how long
5 years from the date of approval
Who sets the Marsec level consistent with the Homeland Security Advisory System
Commandant
A facility response plan is valid for how long
Up to 5 years
Does a new unused hose at a facility need to be blanked off
No, 154.520
A facility needs to exersize the response plan how often
every 3 years
Emergency shutdown for oil tranfers at a facility that first transferred oil on or before November 1, 1980
flow must stop within 60 seconds
Emergency shutdown for oil tranfers at a facility that first transferred oil after November 1, 1980
flow must be stopped within 30 seconds
Emergency shutdown for HAZMAT tranfers at a facility that first transferred HAZMAT before October 4, 1990
flow must stop within 60 seconds
Emergency shutdown for HAZMAT tranfers at a facility that first transferred HAZMAT on or after October 4, 1990
flow must be stopped within 30 seconds
Standard discharge connection
a bolt in at least every other hole, no less than 4 bolts.
bolt in each hole of temporary flange that is othe than ANSI standars
bolt in each hole of each permanently connected flange
Facility operations manual should be
current and readily available for examination by the COTP
How many copies of the Facility response plan need to be submited to the COTP for approval
One copy
worst case discharge for a mobile facility is
entire contents of the container in which the oil is stored or transported
Rubbnish and waste must be placed in
adequate receptacles
The operations manual must meet the operating rules and requirements mandated by 33 CFR ________ and ______
154 and 156
Approved manuals will be stamped __________ on the cover page of the document
EXAMINED by the Coast Guard
What must a new facility submit to the COTP 60 days prior to transfer operations
2 copies of the ops manual and a letter of intent
Each ops manual will need to contain both the geographic location of the facility and the
Physical description of the facility
Response plans can be valid for a period of up to _____ years
5
If a facility is removed from caretaker status they must submit 2 copies of their ops manual no less than
30 days before a transfer takes place
New facilities must submit a response plan to the COTP not less than ________ days prior to the handling, storing or transporting of oil
60 days
What CFR cite requires that there be an appropriate number of translations of the ops manual when conducting a transfer
33CFR154.300(a)(3)
Which volume of MSM contains examples of a response plan approval letter
MSM volume IX
Any facility ops manual that does not follow the format specified within ________ will need to contain a cross reference index page
33CFR154.310(a)
If a marine transfer facility is identified as a significant and substantial harm facility they will be required to submit a response plan under what cfr cite
40 CFR 112
Facilities classified as substantial harm the 5 year approval period will commence on the day the plan was_______
Submitted to the COTP
Facilities identified as significant and substantial harm , the 5 year approval starts__________
The day the COTP approves the plan
The generator of the hazardous waste manifest with prepare the form IAW
40 CFR 262
An employer is exempt from the guidelines found in 29 CFR 1910.120 if they have an EAP in compliance with
29CFR1910.38
What part of 33 CFR 154 includes facility and response plan info, emergency response action plan info, training, and exclusive information.
33CFR154.1035
Any FRP that does not follow the format within______ needs to have a cross reference section
33CFR154.1030(b)
CFR cite for response plans general contents
33CFR154.1030
Containers containing hazmat cannot be stacked more than ______ high
4
Fire extinguishers must be
Available and maintained in adequate quantities on DWF facilities
Records of emergency shutdowns of the Vapor Control System must be kept for how many years
3 years
Reception facilities must be capable of receiving oily mixtures from ocean going ships within ________ hours after notice by that ship
24 hours
Reception facilities must be capable of completing the reception of ballast water containing oily mixtures from the ship in less than _____ hours after waste transfer begins
10
Reception facilities must be capable of completing the reception of other oily mixtures in less than _____ hours after the transfer operations begin
4
Whenever dangerous cargo is _____ or_______ on the facility there must be measures to limit access to the facility
Stored or transfered
Class A mishap
Property damage of 2,000,000 or greater
Class B mishap
Property damage between 500,000 and 1,999,999
Class c mishap
Property damage of 50,000 to 499,999
Class D mishap
Non aviation property damage of 5,000 to 49,999
Aviation property of less than 50,000
Each piece of PPE at a a facility must be
Ready to operate
When writing an NOV for violations found in 33 CFR 104,105 and 106 what must be marked on the NOV
Sensitive Security Information - SSI
What type of facility is required to have an evacuation plan
Significant and substantial harm facility
E2-E3 how many months
6
E3-E4 how many months
6
E4-E5 how many months
6
E5-E6 how many months
12 months
E6-E9 how many months
24 months in each paygrade