1
Q

Waterway suitability assesment should ber submitted with what.

A

Letter of Intent (127)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Vapor Control System must be certified by

A

Certifying Entity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Vapor COntrol System hoses must withstand what vacuum

A

2.0 psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How often for 105 drills

A

3 months

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How often for QI exersize

A

quarterly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Exersizes cannot exceed

A

18 months (security)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Who must guarantee OSHA training for response workers

A

employer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Small discharge containment for hoses or pipes with inside diameter of 6 inches or smaller

A

2 barrels

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Small discharge containment for hoses or pipes with inside diameter of more than 6 inches but smaller than 12 inches

A

3 barrels

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Small discharge containment for hoses or pipes with inside diameter of more than 12 inches

A

4 barrels

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Welding/hot work is prohibited during gas freeing operations within ________________of bulk cargo operations involving flammable or combustible materials.

A

30.5 meters (100 feet)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Welding/hot work is prohibited during fueling operations within ________________of bulk cargo operations involving flammable or combustible materials.

A

30.5 meters (100 feet)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Welding/hot work is prohibited within ________________of explosives.

A

30.5 meters (100 feet)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Welding/hot work is prohibited within ________________of HAZMAT.

A

15.25 meters (50 feet)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How often for deployments exersizes if the facility owns the equipment (154)

A

2 times per year (semi annually)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How often for deployments exersizes for OSRO owned equipmentequipment (154)

A

Annually

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

How often are QI notification exersizes conducted (154)

A

quarterly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

How often must a table top be conducted (154) In a ___________ year period one of these exersizes must include a WCD scenario

A

annually

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

All components of the response plan must be exersized at least once every _______ years

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

After participating in a n AREA exersize a facility owner/operator will no be reqiuoired to participate in another one for _______ years (154)

A

6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

After partricipating in a COTP directed unannounced drill a facility owner/operator will not be required to participate in another one for ______ years

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Facility should retain all exersize records for _____ years

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Who does a facility submit an ASP to

A

Commandant

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Report a TSI to

A

COTP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

Report a security breach to

A

NRC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

Records of Coast Guard inspections are kept for (154)

A

3 years

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

What is the maximum duration of a DOS

A

90 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

DOS for MARSEC level 1 must not exceed

A

90 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

DOS for MARSEC level 2 must not exceed

A

30 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

A facility must comply with a MARSEC level change in how many hours

A

12

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

If a vessel is moored at a facility during a security drill, the vessel

A

CANNOT be required to participate in hte drill

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

What is a COA facility called

A

Reception

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

what form is issued to a reception facility that receives oil

A

COA, Certificate of Adequacy

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

How long are COAs valid for

A

5 years
until suspended
until revoked
33CFR158 no longer aplies

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
35
Q

minimum design burst pressure for each hose assembly must be at least_______the sum of the pressure relief valve settingplus the static head pressure of the transfer sytem, at the point where the hose is installed.

A

4 times

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
36
Q

Each pressure gaugemust show pressure within______ of the actual pressure

A

10%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
37
Q

small discharge containment for a mobile facility

A

not less than 5 gallons

38
Q

In a transfer area, what on a pump is allowed to leak

A

packing glands

39
Q

On a designated Waterfront facility what must be kept in adequate numbers and locations

A

Fire extinguishers

40
Q

A facility security plan is vaild for how long

A

5 years from the date of approval

41
Q

Who sets the Marsec level consistent with the Homeland Security Advisory System

A

Commandant

42
Q

A facility response plan is valid for how long

A

Up to 5 years

43
Q

Does a new unused hose at a facility need to be blanked off

A

No, 154.520

44
Q

A facility needs to exersize the response plan how often

A

every 3 years

45
Q

Emergency shutdown for oil tranfers at a facility that first transferred oil on or before November 1, 1980

A

flow must stop within 60 seconds

46
Q

Emergency shutdown for oil tranfers at a facility that first transferred oil after November 1, 1980

A

flow must be stopped within 30 seconds

47
Q

Emergency shutdown for HAZMAT tranfers at a facility that first transferred HAZMAT before October 4, 1990

A

flow must stop within 60 seconds

48
Q

Emergency shutdown for HAZMAT tranfers at a facility that first transferred HAZMAT on or after October 4, 1990

A

flow must be stopped within 30 seconds

49
Q

Standard discharge connection

A

a bolt in at least every other hole, no less than 4 bolts.
bolt in each hole of temporary flange that is othe than ANSI standars
bolt in each hole of each permanently connected flange

50
Q

Facility operations manual should be

A

current and readily available for examination by the COTP

51
Q

How many copies of the Facility response plan need to be submited to the COTP for approval

A

One copy

52
Q

worst case discharge for a mobile facility is

A

entire contents of the container in which the oil is stored or transported

53
Q

Rubbnish and waste must be placed in

A

adequate receptacles

54
Q

The operations manual must meet the operating rules and requirements mandated by 33 CFR ________ and ______

A

154 and 156

55
Q

Approved manuals will be stamped __________ on the cover page of the document

A

EXAMINED by the Coast Guard

56
Q

What must a new facility submit to the COTP 60 days prior to transfer operations

A

2 copies of the ops manual and a letter of intent

57
Q

Each ops manual will need to contain both the geographic location of the facility and the

A

Physical description of the facility

58
Q

Response plans can be valid for a period of up to _____ years

A

5

59
Q

If a facility is removed from caretaker status they must submit 2 copies of their ops manual no less than

A

30 days before a transfer takes place

60
Q

New facilities must submit a response plan to the COTP not less than ________ days prior to the handling, storing or transporting of oil

A

60 days

61
Q

What CFR cite requires that there be an appropriate number of translations of the ops manual when conducting a transfer

A

33CFR154.300(a)(3)

62
Q

Which volume of MSM contains examples of a response plan approval letter

A

MSM volume IX

63
Q

Any facility ops manual that does not follow the format specified within ________ will need to contain a cross reference index page

A

33CFR154.310(a)

64
Q

If a marine transfer facility is identified as a significant and substantial harm facility they will be required to submit a response plan under what cfr cite

A

40 CFR 112

65
Q

Facilities classified as substantial harm the 5 year approval period will commence on the day the plan was_______

A

Submitted to the COTP

66
Q

Facilities identified as significant and substantial harm , the 5 year approval starts__________

A

The day the COTP approves the plan

67
Q

The generator of the hazardous waste manifest with prepare the form IAW

A

40 CFR 262

68
Q

An employer is exempt from the guidelines found in 29 CFR 1910.120 if they have an EAP in compliance with

A

29CFR1910.38

69
Q

What part of 33 CFR 154 includes facility and response plan info, emergency response action plan info, training, and exclusive information.

A

33CFR154.1035

70
Q

Any FRP that does not follow the format within______ needs to have a cross reference section

A

33CFR154.1030(b)

71
Q

CFR cite for response plans general contents

A

33CFR154.1030

72
Q

Containers containing hazmat cannot be stacked more than ______ high

A

4

73
Q

Fire extinguishers must be

A

Available and maintained in adequate quantities on DWF facilities

74
Q

Records of emergency shutdowns of the Vapor Control System must be kept for how many years

A

3 years

75
Q

Reception facilities must be capable of receiving oily mixtures from ocean going ships within ________ hours after notice by that ship

A

24 hours

76
Q

Reception facilities must be capable of completing the reception of ballast water containing oily mixtures from the ship in less than _____ hours after waste transfer begins

A

10

77
Q

Reception facilities must be capable of completing the reception of other oily mixtures in less than _____ hours after the transfer operations begin

A

4

78
Q

Whenever dangerous cargo is _____ or_______ on the facility there must be measures to limit access to the facility

A

Stored or transfered

79
Q

Class A mishap

A

Property damage of 2,000,000 or greater

80
Q

Class B mishap

A

Property damage between 500,000 and 1,999,999

81
Q

Class c mishap

A

Property damage of 50,000 to 499,999

82
Q

Class D mishap

A

Non aviation property damage of 5,000 to 49,999

Aviation property of less than 50,000

83
Q

Each piece of PPE at a a facility must be

A

Ready to operate

84
Q

When writing an NOV for violations found in 33 CFR 104,105 and 106 what must be marked on the NOV

A

Sensitive Security Information - SSI

85
Q

What type of facility is required to have an evacuation plan

A

Significant and substantial harm facility

86
Q

E2-E3 how many months

A

6

87
Q

E3-E4 how many months

A

6

88
Q

E4-E5 how many months

A

6

89
Q

E5-E6 how many months

A

12 months

90
Q

E6-E9 how many months

A

24 months in each paygrade