F3 - PP&E Cost Basis Flashcards
1
Q
Costs of Plant/Buildings:
A
- Purchase Price
- All repair charges neglected by previous owner(deferred maintance)
- Alteration and improvements
- Architects fees
- Possible addition of construction period interest
- digging a hole for the foundation
2
Q
Costs of Equipment:
expenditures related to acquisiton or construction of equip.
A
- invoice price (cost)
- less cash discounts and other
- Add freight in (and insurance while on transit and while in construction)
- Add installation charges (including testing and perparation for use)
- Add sales and federal excise taxes
- possible additon of consturction period interest
3
Q
Cost of LAND
A
- Cost of land
- cost to raze a building
- minus crap material sale
- excabtation cost is NOT INCLUDED
4
Q
What factor must be present to use the units-of-production (activity) method of depreciation?
A
Total units to be produced can be estimated.
5
Q
A
- 2 X 1/N X (Cost - Accumlated Depreciation)
- no salvage value deducted
- we keep reducing the cost by the acc dep every year it changes and it goes down till we have the salvage value amount
- also the 2/N (stays the same every year)