EXCAVATION Flashcards

1
Q

Is any man-made cut, cavity or depression in any earth surface that is formed by earth removal.

A

Excavation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Is a narrow excavation where the depth is greater than its width, and the width measured at the bottom is not greater than 15ft

A

Trench

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Hazards of excavation

A

Falls
Underground facilities
Vehicular Traffic
Confined Space Condition
Soil Collapse
Working Surface

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Principal Causes of Soil Collapse

A

Steep cutting angle
Superimposed load
Shock and Vibration
Water pressure
Drying

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

2 types of Soil Collapse

A

Sliding
Toppling

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Most Stable:Clay

A

Type A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Medium Stability:Silt and unstable rock

A

Type B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Least stable:Grabel, Loamy Sand, Submerged Soil, soil from which water is freely seeping

A

Type C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Slope of Type A

A

3/4:1 or 53

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Slope of Type B

A

1:1 or 45

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Slope of Type C

A

1 1/2:1 or 34

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Prevention of Soil Collapse

A

Shoring and Timbering
sheet Piles
Plate Lining System
Box Type
Shielding

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Walls of every excavation over __meter deep shall be supported by adequate shoring

A

1 meter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

In minimum berm, it should be not less than ___ of the depth of the excavation
May be reduced to not less than ___ provided that materials are stable, shoring and barriers are present

A

1/3
1meter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Sloped Protected with sod, seed, shrubs or ground cover

A

Berm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

For falls, barricades of at least ___ high should be provided.

A

1 meter

17
Q

___ should be posted to prevent the public from going near the excavation

A

Signs

18
Q

In surface Crossing of trenches, what should be provided?

A

walkways and bridges

19
Q

In surface Crossings of Trenches a minimum clear width of ___ and standard___

A

20 inches, rails

20
Q

In surface crossing of trenches a minimum of __ past the surface edge

A

24inches

21
Q

In vehicular traffic provide workers with ____ or other suitable garments marked with reflectorized materials

A

warning vest

22
Q

Excavation shall be kept free of __ at all times

A

water

23
Q

Muddy area, workers should be provided with ___ to reduce the hazard of slipping

A

boots

24
Q

Hazardous atmosphere in confined space condition shows Oxygen

A

<19.5% or >23.5%

25
Q

Flammable gas concentration

A

> 10%

26
Q

In Ingress and Egress of a ladder a handhold of ___ should always be provided

A

0.75m

27
Q
A
28
Q

Inspection of excavation is everywhen?

A

Daily before start of each shift
After heavy rain
Fissures tension cracks undercutting water seepage