EPRI P94 Flashcards

1
Q

What are epri research portfolio?

A
  1. maintain tech awareness and provide guidance
  2. facilitate availability of storage product
  3. faciliate integration
  4. analyze uses, benefits, costs
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Focus 2013 for P94

A
  1. analysis
  2. grid deployment
  3. actual specification of hardware
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

key issues in 2013 for P94?

A
  1. safety and reliability
    a. high profile incidents magnify risks
    b. standard approach to mitigation can address risk
  2. product integration
    a. technology is maturing, but integrated solutions are nascent, early stage, hard to go out and procure battery simply with a boiler plate specs, b/c not a lot of products have been deployed, ESIC
  3. tools to assess value of storage. more to be done in ESVT
  4. informing the government
    a. policy initiatives are opportunity and challenge
    b. storage as a business arise from regulatory treatment of storage
    c. EPRI is stand ready to inform when requested, from a technical standpoint.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

what are the base programs?

A
  1. strategic intelligence and technology assessments
  2. distributed energy storage options for power delivery
  3. bulk power energy storage solutions
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is ESIC (energy storage integration council)?

A
  1. a forum
  2. technical working group, sponsored by P94 and its members
  3. brings together vendors, researchers, utilties, national labs, everyone.
  4. faciliate reliable safe and cost-effective energy storage options for utility industry.
  5. collabroatively develop well-articulated requirements for utility-scale storage projects and products
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

what is the approach for ESIC?

A
  1. two-day technical meetings twice a year
  2. webcast availability for non-attending members
  3. First meeting Akron, Ohio, Aug. 6
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is 94.001

A

Strategic intelligence and tech assessments

  1. strategic intelligence update newsletter (Bill)
  2. cost and technical capabilities of energy storage (haresh)
  3. monitoring and reporting on energy storage demonstrations (nadav)
  4. energy storage valuation tool 4.0 Beta
  5. ESVT CPUC
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

what is cost and technical capabilities of energy storage project?

A

deliverable: cost and technical capability of energy storage (cost database).
approach: conduct technology deep dives on individual technologies to understand present and future costs and capabilities. focus on lithium ion batteries this year

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is 94.002?

A
  1. Distributed ES options for Power Delivery
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

what is distributed ES options for Power Delivery

A
  1. promote standard terminology
    one: distribution energy storage technology reference guide (satish)
    - -create reference materials for utilities to specify procure install and commission safe and reliable distribution ES
    - -materials include reference technical specs, test plans, test results as available
  2. distribution energy storage integration guide (ARINDAM MAITRA)
    - -integration of the storage product with the grid
    - -can call it interconnection
    - -develop analytical tools to predict how storage affects the grid
    - -continuation of openDSS
  3. Distribution ES with PV systems–case studies
    - -describe field testing of two ES systems at solar TAC facility in Denvor, CO
    - -solar-2-battery (S2B) Lead Acid
    - -Community ES project SODIUM NIC
  4. Peak Load Management of Thermal Loads using Advanced Electrothermal Technologies
    - -2013 lab testing efforts
    - -Ice energy
    - -energy storage capacity of 2 Ton-hr
    - -Hot water
    - -deployed in Britain, trying to get it in to Knoxville
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

what is 94.003

A

Bulk Power Energy Storage Solutions

  • -bulk storage tech reference guide (Sean Wright)
  • -ES for transmission contingency (steve eckroad) midwestern, utility, grid data, black start
  • -Demonstration of 36mw/24mwh advanced lead acid battery at 150MW wind farm (notree) Steve Eckroad, deploy xtreme power battery at notrees winde farm
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

supplemental: battery storage systems and applications demonstration

A
  • Dan
  • deploy a prototype system built according to a spec developed collabroatively by utilities
  • -apply standardized analytical tools to assess grid impacts and benefits
  • deploy the system that was build with the specs
  • -old lithium ion demo
  • -utility brings their own systems, joins collaborative, everyone share the experience with everyone.
  • -taking storage systems from community size to mw scale
  • -international representation
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

supplemental two: assessment of grid benefits of fuel cell at utility substation

A
  • dan
  • case study to look at performance metrics
  • efficiency, reliability availability
  • -3MW solid Oxide Fuel Cell on utility substation
  • -collaborate with bloom energy and delmarva power -the host utility
  • -gain data and experiences to enable follow on utility business case decision
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Supplemental: tool for distribution level energy storage assessment and integration

A

case study based distribution level energy storage assessment
apply tool to participant utilities
develop and validate impact/value integration specification framework
–conduct case study on one feeder
–understand how to determine an avoided cost case
–develop algorithum of storage operation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

supplemental project: Advanced CAES demo (robert)

A

PG&E: 25M cost share to design build 300MW 10hour plant total project cost about 300M to 450M
–NYPA 2M cost share to desin and build 10MW-4.5Hour plant using an aboveground air store, total project cost 20M to 22M

approach

  • -phase 1: preliminary geologic siting, engineering costing, permitting
  • -plant construction support
  • -plant performance monitoring (2yrs)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

what are ESIC’s four represenations

A
  1. system development
  2. grid deployment
  3. applications
  4. performance