EP- Intro Flashcards
1
Q
What are the two EP’s which provide the entry points into the EP set?
A
1) IF a safety injection or reactor trip occurs or is required with initial conditions above P-11, the operator will enter EP/1,2/A/5000/E-0 (Reactor Trip or Safety Injection).
2) IF a complete loss of power on both emergency busses takes place, the operator will enter EP/1,2/A/5000/ECA-0.0 (Loss of All AC Power). This includes any time during the performance of any other EP.
2
Q
“Constrained Language” terms listed in OMP 4-3, Use of Abnormal and Emergency Procedures:
A
- Check - to determine present status. (no action)
- Ensure - to take necessary actions to guarantee that the component or reading is as specified. (Local actions in EPs and APs are only required if step specifies to dispatch personnel though).
- Faulted - refers to a steam generator that has a secondary break.
- Ruptured - refers to a steam generator that has a primary to secondary leak (SGTR).
- Implement - begin a required program or series of procedures.
- Intact - refers to a steam generator that is NOT faulted or ruptured and is available as a heat sink.
- GO TO - discontinue use of present procedure and stay in the referenced procedure. The referenced procedure is always entered at the first step unless otherwise specified.
- REFER TO, PER user is directed to a supplemental procedure/enclosure for actions but will remain in the controlling procedure.
- Stable - Maintained steady. IF a parameter is being controlled within a desired range, or if a slight trend in either direction is occurring, operator judgment may be used to determine if parameter is considered stable.
- Evaluate - Appraise the situation. Includes taking action based on evaluation.
3
Q
The six Status Trees are always evaluated in the sequence:
A
- Subcriticality
- Core Cooling
- Heat Sink
- Integrity
- Containment
- Inventory