The purpose of the Containment Purge System is to supply clean, fresh air to the ___ .
A Turbine Building and Containment
B. Auxiliary Building negative pressure area and Containment
C. ES Containment and the Fuel Handling Ventilation area
D. Chemistry Hot Lab area and the negative pressure area
B
Which ONE of the following is a purpose of the Main Station Exhaust Fans?
A. Maintain the Turbine Building area at a slight negative pressure.
B. Maintains the Auxiliary Building negative pressure area at a vacuum of 0.75”.
C. Assist in ventilating the Fuel Handling Area and the Auxiliary Building Radioactive Area Heating and Ventilation System.
D. Directs potentially contaminated air in the exhaust plenum to atmosphere by way of a High Efficiency Particulate Absolute (HEPA) filter.
C
The following plant conditions exist:
* The monthly surveillance (DB-SS-03250) for Emergency Ventilation System Fan 1 is in progress.
* Emergency Ventilation System Fan 1 running per the surveillance test.
* CV 5024, Emergency Ventilation System Motor Operated Inlet Damper, is closed.
*RE 8447, Fuel Handling Area Ventilation Exhaust Monitor, in Train 2 trips.
Which one of the following identifies emergency Ventilation System operation under these conditions?
A. Both Emergency Ventilation System fans will be ON, taking suction from the Fuel Handling Area.
B. Emergency Ventilation System Fan 1 will be OFF. Emergency Ventilation System Fan 2 will be ON, taking suction from the Fuel Handling Area.
C. Both Emergency Ventilation System fans will be ON, taking suction from Mechanical Penetration Room 4.
D. Emergency Ventilation System Fan 1 will be ON, taking suction from Mechanical Penetration Room 4. Emergency Ventilation System Fan 2 will be OFF.
C
The Radwaste Ventilation System is designed to provide approximately ____ complete air change(s) in all of its supply areas every hour.
A. One (1)
B. Two (2)
C. Five (5)
D. Ten (10)
C
The running Main Station Exhaust fan has tripped due to high discharge air temperature. Which ONE of the following would be the response of the Radwaste Ventilation System?
A. The Radwaste Ventilation System would automatically shut down to keep from overpressurizing the exhaust plenum.
B. The Fuel Handling Area Bypass Valves CV5024 and CV5025 would open to provide a discharge flowpath for the Radwaste Exhaust fan.
C. The Radwaste Ventilation System would go into a recirculation mode until it was shut down or a Main Station Exhaust fan was placed in service.
D. The Radwaste Ventilation System would continue to operate and discharge air through the fixed louver on the exhaust plenum.
D
Station Emergency Ventilation System can provide backup ventilation to which THREE (3) of the listed ventilation systems:
1 . Control Room Emergency Ventilation System
2. Containment Purge
3. Rad Waste Ventilation
4. Hot Lab Exhaust Fans
5. Fuel Handling Ventilation
6. Main Station Exhaust
A. 1, 2, 5
B. 2,3,4
C. 2,3, 5
D. 3,4, 6
C
Which of the following statements describes the rated air flow of the Emergency Ventilation System Trains.
A. 4000 Standard Cubic Feet per Minute for each fan
B. 6000 Standard Cubic Feet per Minute, total for 2 fans
C. 8000 Standard Cubic Feet per Minute for each fan
D. 12000 Standard Cubic Feet per Minute, total for 2 fans
C
The Station Emergency Ventilation System Fans Cross Tie Dampers (CV 5056 and CV 5057) are interlocked with a temperature switch. Why is this interlock required?
A. To prevent running fan from overheating.
B. To prevent a fire in one train from reaching the other train.
C. To prevent the charcoal filters from reaching desorption temperature.
D. To prevent the particulate filter from reaching desorption temperature.
C
The Emergency Ventilation System is designed to maintain a _____ pressure in areas of the Auxiliary Building ______ .
A. negative; normally
B. negative; post Loss of Coolant Accident
C. positive: normally
D. positive; post Loss of Coolant Accident
B
Which ONE of the following fans discharges directly to the Exhaust Plenum?
A. Access Booster Fan
B. Lab Hood Exhaust Booster Fan
C. Fuel Handling Area Supply Fan
D. Radwaste Ventilation Supply Fan
B
From the below list of fans, select the combination of these fans which discharge DIRECTLY to the Exhaust Plenum.
- Fuel Handling exhaust fans
- Control Room Normal Ventilation exhaust fans
- Hot lab exhaust fans
- Radiological Waste exhaust fans
- Lab hood booster fan
- Access Control Area booster fan
A. 1, 2, 6
B. 1, 4, 5
C. 2,3,5
D. 3, 4,6
B
Which of the following statements describes where the Main Station Exhaust Fans discharge?
A. Turbine Building Roof Vents
B. Auxilary Building Annulus space
C. Station Vent in Fan Alley
D. Radwaste Ventilation Exhaust Plenum
C
Safety Features Actuation System Level 1components have been ACTUATED due to plant conditions. Which Combination of the following Station Emergency Ventilation System actions will occur as a result of this condition?
A. Fuel Handling Area Bypass dampers (CV5024 and CV5025) CLOSE and Emergency Ventilation System Inlet Dampers (CV5017 and CV5018) OPEN
B. Containment Purge dampers (CV5005 and CV5008) OPEN and Penetration Room #4 Purge Out Dampers (CV5009 and CV5021) OPEN
C. Emergency Ventilation System fans #1 and #2 AUTOMATICALLY start to lower the annulus pressure.
D. Emergency Ventilation System discharge will modulate some recirculation air flow to maintain a prescribed pressure band.
A. a. b. and c.
B. a. b. and d.
C. a. c. and d.
D. b c. and d.
C
Which of the following are the locations for the elapsed time counters for the Emergency Ventilation Fans 1- 1 and 1- 2.
A. #1 High Voltage Switchgear Room and #2 High Voltage Switchgear Room
B. Adjacent to #1 Emergency Ventilation System fan and adjacent to #2 Emergency Ventilation System fan
C. #1 Electrical Penetration Room and #2 Electrical Penetration Room
D. #1 Low Voltage Switchgear Room and #2 Low Voltage Switchgear Room
D
The EMERGENCY VENT FANS CROSS TIE DAMPER 1, CV 5056, will AUTOMATICALLY
A. OPEN on HIGH temperature to prevent desorption of iodine from the charcoal filters.
B. OPEN on LOW flow to prevent desorption of iodine from the charcoal filters.
C. CLOSE on HIGH moisture to prevent moisture saturation of the absolute filters.
D. CLOSE when the running Emergency Ventilation System fan TRIPS to align for subsequent RESTART.
A
When HIGH radiation signals from the Containment Purge Ventilation System Radiation Monitors (RE-5052A, B & C) are received, the Containment Purge System is aligned to the Emergency Ventilation System by the ____ opening of the cross connect damper to Emergency Ventilation System (CV 5061) and the _____ start of the Emergency Ventilation System fan.
A. AUTOMATIC; AUTOMATIC
B. AUTOMATIC; MANUAL
C. MANUAL; AUTOMATIC
D. MANUAL; MANUAL
B
The Fire Stat on the discharge side of the Fuel Handling Area Supply fan has TRIPPED. Which of the following will automatically occur as a result of this trip?
A. Fuel Handling Area Exhaust fan trips
B. Control Room annunciator UNIT FIRE OR RAD TRBL alarms
C. Fuel Handling Area Exhaust fan AND Fuel Handling Area Supply Fan trip
D. Emergency Ventilation System auto starts AND aligns to Fuel Handling Ventilation
B
Which of the following ventilation systems can be started from Ventilation Control Panel C5801 located in Room 500, Radwaste and Fuel Handling Air Supply Equipment Room.
1 . Emergency Ventilation System
2. Main Station Exhaust Fans
3. Radwaste Supply and Exhaust Fans
4. Lab Hood Exhaust Booster fan
5. Containment Purge Supply & Exhaust fans
A. 1, 2, 3
B. 2,3,4
C. 3,4, 5
D. 4, 5, 1
B