Emergency Actions Flashcards
4 Immediate Actions for Loss of Generation
- Request Reserves from NWPP
- Update RTD Dispatch Control
- Update Load Bias
- Change Mode Control to AUTO for units in REG
SOL Exceedance which requires RC notification within 5 minutes. (7)
-IROL exceedance
- Verified insecure operating state
- Actual or calculated post-contingency exceedance of stability limits
- calculated post contincgency exceedance of highest emergency rating by 125%
Calculated Post Contingency exceedance of Emergency Low System Voltage
-Actual exceedance of emergency limit time parameter
SOL exceedance which requires RC notification within 20 minutes. (4)
- Calculated Post contingent exceedance of highest emergency rating of 100-125%
-Actual exceedance of normal Facility Ratings - Actual exceedance of Normal System Voltage ratings.
- Calculated Post Contingency exceedance of emergency High System Voltage Limit
SOL exceedance which requires RC notification within 30 minutes. (2)
Post Contingency exceedance that a TOP cannot mitigate in a timely manner. (Provide post-contingent plan.
SOL Exceedance, which were mitigated according to an operating guide procedure, or outage, card instruction.