Emergency Actions Flashcards

1
Q

4 Immediate Actions for Loss of Generation

A
  1. Request Reserves from NWPP
  2. Update RTD Dispatch Control
  3. Update Load Bias
  4. Change Mode Control to AUTO for units in REG
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

SOL Exceedance which requires RC notification within 5 minutes. (7)

A

-IROL exceedance
- Verified insecure operating state
- Actual or calculated post-contingency exceedance of stability limits
- calculated post contincgency exceedance of highest emergency rating by 125%
Calculated Post Contingency exceedance of Emergency Low System Voltage
-Actual exceedance of emergency limit time parameter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

SOL exceedance which requires RC notification within 20 minutes. (4)

A
  • Calculated Post contingent exceedance of highest emergency rating of 100-125%
    -Actual exceedance of normal Facility Ratings
  • Actual exceedance of Normal System Voltage ratings.
  • Calculated Post Contingency exceedance of emergency High System Voltage Limit
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

SOL exceedance which requires RC notification within 30 minutes. (2)

A

Post Contingency exceedance that a TOP cannot mitigate in a timely manner. (Provide post-contingent plan.
SOL Exceedance, which were mitigated according to an operating guide procedure, or outage, card instruction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly