Draft tube access gallery / runner hub drain header
367

Maximum tail water
444
Crane access balcony
457 assembly bay + 10
Minimum tailwater for navigation
385
Minimum headwater
442
Center of switchyard / top of powerhouse parapet
496
Centerline of scroll case and wicket gates
395

Bottom of station sump
348

Unwatering sump water level alarm sounds / unwatering sump pumps start (manually)
340
Bottom of draft tube
335
Spillway crest
406

Intake to scroll case backfill
430
Classroom roof
464 top of dam + 1

Bottom of Unwatering Sump
326

Top of trash racks
420
Pump floor
414.75 Generator cooling water pump Unwatering pumps Governor oil accumulator tank Generator emergency cooling water pump Governor oil pump and sump Deluge fire pump Access to elev 428

Turbine floor
413-Elevator storage room Heavy equipment room Water treatment room Oil storage room Oil purification room Access to station sump pump floor Oil storage and purification CO2 Raw service water pumps Farval greasers Access to thrust housing Access to wheel pit Access to scroll case door Access to Unwatering valve room Warehouse transformer 1 and 2 Generator CO2 equipment Spread room Cable gallery Generator surge protection equipment Air compressors ( station service, evacuation, governor ) Air receiver tanks ( station service, evacuation, brake, governor )
Top of dam
463

Station sump pump discharge to tailwater
400
Generator floor
428 Machine shop Electric shop Electric storage room Break room Switchgear room # 1 Control room Switchgear room # 2 Battery room MG room Fan room # 2 Emergency diesel room Fan room # 3 Restrooms
Station sump pump room floor
393

Top of classroom roof parapet
466.33

Top of Powerhouse Crain Rail
471.5

Generator cooling water intake
398
Bottom of spillway bucket
372

Emergency cooling water intake / raw water intake
410
Tail deck
418
Center of Generator Shaft Coupling
416
Spillway bulkhead storage/spillway gate machinery compartments
455

Maximum headwater
450
Transformer yard
447 Parking plaza Service bay erection area Service bay erection area storage Visitors lobby Office area Communication room File room Fan room # 1 Classroom Top of spillway gates

Depressed water level
375
Minimum Tailwater / Top of Spillway Bucket
382

Intake deck
452 max HW + 2
Normal headwater
445
Oil circuit breaker bases
496.5
Side of switchyard
495.75
Intake to tailwater gage well
380
Excavation for unwatering sump (lowest elevation)
323

Centerline of spillway gate trunions
425

Bottom of Trash Rack
374
Valve Room for Unwatering Valves
400.5
Clean and Dirty Lube Oil Pumps and Purifier
410.5
Lock Operating Building
455.5
Thrust Housing Floor
420.5