Electrical Systems Flashcards
batteries volts and amps
2, 24 volt and 28 amps
how long do the batteries guarantee power for (if operated correctly)
30 minutes
generator volt and amps
28V, 300 amps
battery amp charge rate must be less than ____ prior to takeoff
20 amps
AC power voltage
115 volts, 400 Hz power
transient load of 400 amps is allowed for
2 minutes max
can tripped circuit breakers be reset
no unless deemed necessary, only 1 attempt is allowed
Bus with a P
DC
Bus with an X
AC
Bus with S
split
6 positions on the rotary switch
B1, B2, PS1, PS2, PE, XFER
____ V or greater will cause GCU to open GLC due to over voltage
32.5
How many generators?
3
each engine, APU
bus tie contractor will automatically open if the system drops below
24.5 V
must be under _____ amps for takeoff
20
Where does the Gpu plug in
right, aft fuselage (close to under the tail, by the apu exhaust)