ELECTRICAL SYSTEM Flashcards
ELECTRICAL SYSTEM
28- VOLT DC, SPLIT BUS SYSTEM WITH A NEGATIVE GROUND
ELECTRICAL POWER IS SUPPLIED BY
(2) 30- VOLT, 250 AMP DC STARTER GENERATORS
1 BATTERY 24V, 42 AMPS HR
BACK UP SOURCE POWER
24- VOLT BATTERY
WHAT INTERCONNECTS GENERATOR BUSES?
(2) 325- AMP CURRENT LIMITERS
THE ENTIRE BUS SYSTEM OPERATES AS A …
SINGLE BUS, WITH POWER PROVIDED BY THE BATTERY AND THE GENERATORS.
EACH SUBPANEL FEEDER SUPLIES TWO DUAL BUSES TRHOUGH…
50 AMP CIRCUIT BREAKERS AND ISOLATION DIODES
WHAT SOURCES SUPPLY THE ESSENTIAL COMPONENTS?
HOT BUS (BATTERY) AND SUBPANEL FEEDER.
WHAT WILL PROVIDE ONE INVERTER?
400- HERTZ, 115 VAC TO THE AVIONICS/ 400- HZ, 26 VAC TO THE TORQUEMETERS
CAPABILITY OF THE BATTERY, GOOD CONDITION
STARTING BOTH ENGINES, BACKUP POWER 30 MINUTES
HOW LONG DOES THE BATTERY NEED A CHECK?
18 MONTHS
WHAT PROVIDES A LEAD-ACID BATTERY?
24- VOLT, 42- AMP/ HOUR.
WHERE DOES THE DC IS OBTAINED?
BOTH GENERATORS AND BATTERY.
WHAT DOES THE STARTER GENERATORS DO?
PRODUCE TORQUE FOR STARTING AND GENERATES ELECTRICAL CURRENT FOR STARTING AS WELL
WHICH IS THE CURRENT OF THE STARTER GENERATORS?
30V, 250 AMP DC.
THE STARTER GENERATORS ACTS AS A STARTER AND …
DRIVES THE ENGINE COMPRESSOR SECTION THROUGH THE ACCESSORY GEARING.