Location of Main Battery
Nose compartment
Location of the APU Battery
Aft equipment bay
Max Engine Generator load
40 KVA
Max APU Generator load
40 KVA
Max Transformer rectifier unit (TRU) load
120 amps
Max permissible time for ground operations with battery power only
5 minutes
What is the reason for max permissible time for ground operations with battery power
To prevent ED1 and ED2 from overheating (fans are AC powered)
How many TRUs are installed
4
Where are the TRUs located
nose compartment
The Main Battery is rated to
17 ampere hour/24 volts
APU Battery is rated to
43 ampere hour/24 volts
How many generators are installed
four, 2 engine generators, 1 APU generator, 1 ADG
What is the function of the 4 TRUs
To convert 115 V AC to 28 V DC
How are the TRU’s cooled
Individual fans
Which buses are powered when the Battery Master switch is selected on
Main battery direct bus
APU battery direct bus
DC Battery bus