EA 1-6 Flashcards

1
Q

What is EA Credit 1 called?

A

Optimize Energy Performance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How many points are available for Optimize Energy Performance?

A

Ten

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the intent of Optimize Energy Performance Credit?

A

Achieve increasing levels of energy performance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What standard is used as a baseline for Optimize Energy Performance Credit?

A

ASHRAE/IESNA Standard 90.1-1999

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What metric is used when evaluating Optimize Energy Performance Credit?

A

Cost

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What method is used to determine cost savings in Optimize Energy Performance Credit?

A

Energy Cost Budget Method (whole building simulation).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the regulated energy components for Optimize Energy Performance Credit?

A

HVAC systems, building envelope, service hot water systems, and interior lighting.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How much must you reduce energy design cost for a new and existing buildings to get two points for the Optimize Energy Performance Credit 1.1?

A

20% for new, 10% for existing.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How much must you reduce energy design cost for a new and existing buildings to get all ten points for the Optimize Energy Performance Credit 1.1?

A

60% for new, 50% for existing.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the EA Credit 2 called?

A

Renewable Energy

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the intent of Renewable Energy Credit?

A

Encourage and recognize increasing levels of on-site renewable energy,help to reduce environmental impacts associated with fossil fuel energy use.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How many points are available for Renewable Energy?

A

Three

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the requirement for Renewable Energy Credit 2.1?

A

5% of total energy load cost in renewables.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the requirement for Renewable Energy Credit 2.2?

A

10% of total energy load cost in renewables.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the requirement for Renewable Energy Credit 2.3?

A

20% of total energy load cost in renewables.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What are some renewable technologies to achieve EA Credit 2?

A

Solar, wind, geothermal, biomass, hydro and bio-gas.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What is EA Credit 3 called?

A

Additional Commissioning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

What is the intent of Additional Commissioning Credit?

A

Ensure entire building designed, constructed, and calibrated to operate as intended.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What is the difference between Prerequisite 1 and Credit 3?

A

Prerequisite 1 is for “fundamental building”, Credit 3 is for “entire building.”

20
Q

How many points are available for Additional Commissioning?

A

One

21
Q

What is the 1st requirement of Additional Commissioning Credit?

A

1) A commissioning authority, independent of the design team, shall review design prior to the construction document phase.

22
Q

What is the 2nd requirement of Additional Commissioning Credit?

A

2) An independent commissioning

authority shall review construction documents when close to completion.

23
Q

What is the 3rd requirement of Additional Commissioning Credit?

A

3) An independent commissioning authority shall review the contractor submittals relative tosystems being commissioned.

24
Q

What is the 4th requirement of Additional Commissioning Credit?

A

4) provide the owner with a single manual that contains the information required for recommissioning building systems.

25
Q

What is the 5th requirement of Additional Commissioning Credit?

A

5) Have a contract in place to review building operation with O&M staff,including a plan for resolution of outstanding commissioning-related issues within one year after construction completion date.

26
Q

What is EA Credit 4 called?

A

Ozone Protection

27
Q

What are 2 intents of the Ozone Protection Credit?

A

Reduce ozone depletion and support compliance with the Montreal Protocol.

28
Q

How many points are available for Ozone Protection?

A

One

29
Q

What is required for the Ozone Protection Credit?

A

Install base building level HVAC, refrigeration equipment, and fire suppression systems that do not contain HCFC’s or Halons.

30
Q

What are some strategies to achieve the Ozone Protection Credit?

A

Building reuse: replace building systems that contain HCFCs or Halons; new buildings: specify refrigeration and fire suppression systems that use no HCFCs or Halons.

31
Q

What is EA Credit 5 called?

A

Measurement & Verification

32
Q

What is the intent of Measurement & Verification Credit?

A

Accountability and optimization of building energy and water consumption.

33
Q

How many points are available for Measurement & Verification?

A

One

34
Q

What is the framework used for Measurement & Verification?

A

Option B,C or D of the2001 International Performance Measurement & Verification Protocol (IPMVP) Volume I: Concepts and Options for Determining Energy and Water Savings.

35
Q

What energy & water systems are included in the Measurement & Verification Credit?

A

Lighting systems & controls, constant and variable motor loads, variable frequency drive operation, chiller efficiency at variable loads, cooling load, air and water economizer, air distribution static pressures,boiler, indoor water risers, outdoor irrigation.

36
Q

What are some strategies to achieve the Measurement & Verification Credit?

A

Model energy & water to predict savings. Design with equipment that measure energy & water

37
Q

What is EA Credit 6 called?

A

Green Power

38
Q

What is the intent of the Green Power Credit?

A

Encourage the development and use of grid-source energy technologies on a net zero pollution basis

39
Q

How many points are available for the Green Power?

A

One

40
Q

What is the requirement for the Green Power Credit?

A

Engage in two-year contract to purchase power generated from renewable sources for at least 50% of power.

41
Q

What framework does the Green Power credit use?

A

Center for Resource Solutions (CRS) Green-e products certification requirements.

42
Q

What can Green Power be derived from?

A

Solar, wind, geothermal, biomass, or low impact hydro sources.

43
Q

Prereq. Memory 3 flying building systems commissioners were minding energy performance, while cfc’s escaped from the HVAC system.

A

3 prerequisites, Fundamental Building Systems Commissioning, Minimum Energy Performance, CFC Reduction in HVAC&R Equipment .

44
Q

Credits (6 oem pa loompas, re,act,oddly when they measure and verify green power)

A

6 credits, Optimize Energy Performance, Renewable Energy, Additional commissioning, ozone depletion, measurement and verification, green power.

45
Q

Point Structure (Tent the 3 wives and the 4 little ones)

A

10,3,1,1,1,1