Duct Testing and Sealing Flashcards
Disconnected ducts must be _________ prior to duct testing.
Disconnected ducts must be reattached prior to duct testing.
What is maximum allowable duct leakage to outside upon test-out for a system with a 3.5 ton compressor?
140 CFM25
The ______ should be the first priority when sealing a duct system as it’s the component under the highest ______.
The plenum should be the first priority when sealing a duct system as it’s the component under the highest pressure.
What is the only duct testing procedure whose results are accepted by the Energy Upgrade California program?
Leakage-to-outside
A leakage-to-outside duct test requires the simultaneous operation of the ____ ____ while pressurizing the ducts.
blower door
Results from a total leakage duct test are not accepted by the Energy Upgrade California program because they do not quantify _____-__-_____.
leakage-to-outside
____ ____ is not an allowable duct sealing material.
Duct tape
What is the minimum acceptable level of duct insulation in San Diego?
R-6
Ducts located in a crawlspace must be supported at least _ inches above the earth with _ feet of spacing between supports.
Ducts located in a crawlspace must be supported at least 4 inches above the earth with 4 feet of spacing between supports.
Mastic can be applied to gaps up to __” wide that are more than __ feet from the air handler.
Mastic can be applied to gaps up to 1/4” wide that are more than 10 feet from the air handler.