Steps in Disaster Recovery (5)
B4-57
1- Assess the Risk
2- Identify Mission-critical applications and Data
3- Develop a plan
4- Determine involved Personnel Responsibilities
5- Test the plan
Types of Backups (3)
B4-58
1- full backup
2- incremental
3- differential
Define Full backup
B4-58
An exact copy of the entire database
-takes the longest time
Define Incremental backup
B4-58
Copies only the data items that have changed since last backup.
- a type of partial backup
- takes the shortest time
Define Differential backup
B4-58
Copies all changes made since the last full backup
-takes the middle time
Disaster Recovery
Types of Offsite Locations (3)
B4-59
1- Hot site
2- Warm site
3- Cold site
Disaster Recovery
Define Hot site
B4-59
Off-site location equipped to take over the data processing. Backup copies of data maintained at location or nearby facility.
-timing: few hours
Disaster Recovery
Define Warm Site
B4-59
facility that is already stocked with all hardware needed to create reasonable facsimile of primary data center.
-timing: half to 1 day
Disaster Recovery
Define Cold Site
B4-59
Off-site location that has the electrical connections and other physical requirements for data processing, but no actual equipment.