Dirt Flashcards

1
Q

What are the characteristics of an effective crater?

A

Too wide for track vehicles to span

Too steepsided for vehicles to pass

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

At least how many passes must a modern tank need to traverse a crater for the crater to be effective?

A

4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the borehole depths and amounts of explosives per hole for a Hasty Crater?

A

5 feet deep

At least 50 lbs of explosives per hole

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the spacing between Hasty Crater boreholes?

A

5 feet on center

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How wide are the blowouts of a Hasty Crater?

A

Approximately 8 feet beyond the end boreholes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the characteristics of a completed Hasty Crater?

A

V-shaped crater, 6-7 feet deep, 20-25 feet wide, side slope of 25-35 degrees

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the Hasty Crater formula?

A

N = (L-16) / 5 + 1

Round up to the next whole number

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the borehole depths and amounts of explosives per hole for a Deliberate Crater?

A

5 feet deep holes with 40 lbs of explosives

7 feet deep holes with 80 lbs of explosives

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the spacing between Deliberate Crater boreholes?

A

5 feet on center

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are the rules for selecting depths of Deliberate Crater boreholes?

A

End boreholes are 7 feet deep

No two 5 feet deep boreholes side by side

Center borehole is 7 feet deep

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the characteristics of a completed Deliberate Crater?

A

V-shaped crater, 7-8 feet deep, 25-30 feet wide, side slope of 37 degrees

Modern tanks require an average of 8 attempts to traverse

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the Deliberate Crater formula?

A

N = (L-16) / 5 + 1

Round up to the next whole number

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When there is an even number of total boreholes for a Deliberate Crater, how many more 7 feet boreholes are there than 5 feet boreholes?

A

2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are the borehole depths and amounts of explosives per hole for a Relieved Face Crater?

A

Friendly row boreholes are 5 feet deep with 40 lbs of explosives

Enemy row boreholes are 4 feet deep with 30 lbs of explosives

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How much delay should there be between the detonation of friendly and enemy row boreholes in a Relieved Face Crater?

A

0.5 to 1.5 seconds

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Which row is fired first on a Relieved Face Crater?

17
Q

How wide are the blowouts of a Deliberate Crater?

A

Approximately 8 feet beyond the end boreholes

18
Q

What is the spacing between rows for a Relieved Face Crater on dirt or gravel roads?

A

8 feet apart

19
Q

What is the spacing between rows for a Relieved Face Crater on hard surface roads?

A

12 feet apart

20
Q

What is the spacing between boreholes in a Relieved Face Crater?

21
Q

How wide are the blowouts of a Relieved Face Crater?

A

Approximately 5 feet beyond the end boreholes

22
Q

What are the characteristics of a completed Relieved Face Crater?

A

Trapezoidal-shaped crater, 7-8 feet deep, 25-30 feet wide, unequal side slopes

23
Q

What is the formula for a Relieved Face Crater?

A

N = (L-10) / 7 - 1

Round up to the next whole number

24
Q

How many enemy boreholes will there be relative to friendly boreholes in a Relieved Face Crater?

A

One less enemy borehole

25
How much explosives should you use to breach hard surface pavement for manual breaching?
1 lb of explosives per 2” of pavement
26
How much should you tamp a charge to breach hard surface pavement for manual breaching?
Twice the breaching radius
27
What is an Expedient Cratering Charge composed of?
Ammonium nitrate fertilizer and fuel oil (motor oil, diesel, gas)
29
How much nitrogen must the fertilizer in an Expedient Cratering Charge contain?
33 1/3% or higher
30
What is the fuel mix ratio for an Expedient Cratering Charge?
1 quart per 25 lbs of fertilizer
31
How many times should you prime an Expedient Cratering Charge?
Dual priming is recommended
32
What can happen if you leave an Expedient Cratering Charge in the borehole for a long period of time?
It will accumulate moisture and reduce its effectiveness
33
How long do you soak the fertilizer in fuel for an Expedient Cratering Charge?
1 hour
34
How are stumps measured for Land Clearing Charges?
12-18 inches a over ground level Diameter is rounded up to the next 1/2 foot
35
How much explosives are used for Stump Removal based on the diameter of the stump?
1 lb of explosives per 1 foot of diameter for dead stumps 2 lbs of explosives per 1 foot of diameter for live stumps 3 lbs of explosives per 1 foot of diameter for complete trees
36
What are the two types of trees to consider for Stump Blasting Charges?
Lateral and taproot
37
What is the hole depth of a Stump Blasting Charge for a lateral tree?
Stump radius
38
What is the hole depth of a Stump Blasting Charge for a taproot tree?
Stump diameter