Diagrams Of Work Flashcards
What could these be referred as?
Diagrams, dockets or scheduling card
LTP
Long term planning
STP
Short term planning
AP
Attach portion
ASST
Assist as required
BREAK
Break away from cab environment
CONDT
Route or traction conduct
CRE
Collect revenue equipment
DISP
Dispose of train
DP
Detach portion
DRE
Deposit revenue equipment
PASS
Travel as passenger between specified locations
PT
Prepare train and leave secure in service
PTDT
Prepare train and carry out door test
REL
Relieve conductor and take over train service
RELD
Relieved by conductor
RPFM
Re-platform
UP
Unit prepared
TRAM
Travel by metrotram
TAXI
Travel in pre-arranged taxi
Validity- X
Excluded
Validity- O
Only
SX
Saturday excluded
SUX
Sunday excluded
MX
Monday excluded
SO
Saturday only
SUO
Sunday only
MO
Monday only