DHL electrical Flashcards
What items are load shed at start. ?
Utility bus
C2 hydraulic
Centre tank fuel pumps
What is the priority for electrical distribution ?
IDG
APU
Ground power
Hot battery bus powers what.
Captains clock Fire extinguishing Parking brake valve. Refuelling panel. IRS Manual deployment rat Gear up locks.
Load shedding is armed when
When thrust levers advanced.
When load shedding takes place when can you get systems back.
Second generator source to be established.
Load shedding 3 types
Overload
Engine start load shedding
Loss of second source .
Ground service bus can it be powered in the air.
Yes to service battery chargers
When can ground handling bus be powered
Only on the ground .
Selecting batt off
No effect during flight
Stby power off in flight
Standby DC and AC bus will be unpowered
Left and right tank capacity
6.6 tonnes
Centre tank capacity
21 tonne