Design & Specification Flashcards
What makes up a Specification
- Prelims
- Material & Workmanship
- Schedule of Works
What are in the Prelims
“Preliminaries provide a description of a project that allows a contractor to assess costs which whilst they do not form a part of any package of works”
- Testing
- Management and Staff
- Site establishment
- Temporary Services
- Security
- Insurance
- Party Wall Requirements
- Testing
- Need for Building Notice
- Type of Contract
- Dispute Resolution Procedures
What is the difference between Provisional Sum and Prime Cost
“they both relate to estimates made for certain costs in the absence of exact figures”
((Prime Cost Sum)) - an allowance for the supply of work or materials to be provided by a SUB CONTRACTOR or SUPPLIER that will be nominated by the CLIENT.
((Provisional Sum))- an allowance usually estimated by a cost consultant, for a specific element of the works that is not yet defined in enough detail for tendered to accurately price.
DEFINED - Have been described in sufficient detail (i.e Brick Repairs)
UNDEFINED- less well described as they refer to work which is not completely designed (EOT/ additional payment sort when actual works are undertaken)
What specification of mortar did you use ? What are the risk if you use a hard mortar to point soft brickwork ?
- 1:4 Cement / Sand
- Pointing allows the bricks to breathe
- Hard cement prevents this and causes water saturation (eventually sprawling)
- NHL 2.5 Natural Hydraulic Lime Mortar is best ?