What makes up a Specification

A
  1. Prelims
  2. Material & Workmanship
  3. Schedule of Works
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are in the Prelims

A

“Preliminaries provide a description of a project that allows a contractor to assess costs which whilst they do not form a part of any package of works”

  • Testing
  • Management and Staff
  • Site establishment
  • Temporary Services
  • Security
  • Insurance
  • Party Wall Requirements
  • Testing
  • Need for Building Notice
  • Type of Contract
  • Dispute Resolution Procedures
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the difference between Provisional Sum and Prime Cost

A

“they both relate to estimates made for certain costs in the absence of exact figures”

((Prime Cost Sum)) - an allowance for the supply of work or materials to be provided by a SUB CONTRACTOR or SUPPLIER that will be nominated by the CLIENT.

((Provisional Sum))- an allowance usually estimated by a cost consultant, for a specific element of the works that is not yet defined in enough detail for tendered to accurately price.

DEFINED - Have been described in sufficient detail (i.e Brick Repairs)

UNDEFINED- less well described as they refer to work which is not completely designed (EOT/ additional payment sort when actual works are undertaken)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What specification of mortar did you use ? What are the risk if you use a hard mortar to point soft brickwork ?

A
  • 1:4 Cement / Sand
  • Pointing allows the bricks to breathe
  • Hard cement prevents this and causes water saturation (eventually sprawling)