Design Economics and Cost Planning Flashcards

1
Q

what aspects of design affect the efficiency?

A

site density, wall/floor ratio, room size, lettable area, size, shape, height, grouping, circulation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

what is the wall to floor ratio

A

area of the external walls divided by the floor area - the lower the better

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

whats included in a cost plan

A

executive summary, inclusions, exclusion, assumptions, elemental breakdown of costs, fees, prelims, OHP, inflation, location, basis of information, floor area

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

what would be excluded?

A

VAT, client direct costs, land specific costs, building regs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

assumptions?

A

asbestos, ground conditions, design, quants, programme

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

what are the 3 titles of the NRM?

A
  1. order of cost estimating and cost planning for capital buildings works
  2. detailed measurement for building works
  3. order of cost estimating and cost planning for building maintenance works
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

what elements would be found in NRM?

A

Fac. Works – sub – super – finishes – FFE – services – prefab – work to existing – ext. works – prelims – OHP – project/design fees – other - risk

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

what is the MMHW?

A

part of the manual of contract documents for highway works - provides definitions and measurement standards for highways works

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

what sections are in the MMHW?

A

definitions – gen. principles – prep of BQ – units of measurement

100 Prelims – 200 site clearance – 300 Fencing – 400 RRS – 500 Drainage & service Ducts – 600 Earthworks – 700 pavements – 1100 Kerbs Footways and paved areas – 1200 traffic signs and road markings – 1300 Road lighting columns, CCTV – 1400 Electrical work for road lighting and traffic signs – 3000 landscape and ecology

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

whats in the MCDHW

A

specifications, guidance on spec, construction details, BQM contract documents, departmental standards

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

VE process?

A

RICS guidance notes - understand, identify solutions and evaluate, develop, make recommendations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

whats an acoustic rating?

A

rating of sound insulation. Rw rating for the sound insulation in factors, is converted to the Dw rating of the room on site - clients and building regs require Dw rating

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

whats the RICS code of measurement practice?

A

guidance note providing succinct definitions to enable accurate measurement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

international property measurement standards?

A

measurement standards formed by non profit and professional organisations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

international construction measurement standard?

A

formed by non profit and professional organisations for benchmarking and reporting project cost

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

when have you completed VE exercise?

A

bus route / lounges

17
Q

difference between a cost estimate and cost plan?

A

cost estimate is an early stage prediction of costs to guide client on budget and feasibility using any known design info

cost plan typically at stage 3 or 4, presents costs in elemental breakdown showing how money will be spent across project - evolves with project

18
Q

RIBA stages

A
0 strategic definition
1 prep and brief
2 concept design
3 spatial coordination
4 technical design
5 manufacturing and construction
6 handover
7 in use
19
Q

changes to RIBA?

A

developed design is now spatial coordination

construction is now manufacture and construction

20
Q

OGC Gateway?

A

office of government commerce - plans project phases for public projects