Decontamination Science Revision Lecture Flashcards
Discuss the container standards for transportation of contaminated instrumentation:
Container must be:
- Durable
- Leak proof
- Rigid sided
- Colour coded or clearly marked
- Tight fitting lid
What is the first stage of WD decontamination?
Cleaning
Why must we clean instruments?
- Medico-legal requirement
- Biological matter can impact function
- Minimises cross-contamination
- Biological substances prevent steam contact
- Reduces risk when handling instruments
Discuss appropriate loading patterns of the washer-disinfector:
- No overlapping
- Do not overload
- Utilise the available load carrier
- All assemblies should be dissembled
- Forceps should be open at the hinge
- Restorative material should be removed
What are the 5 stages of the washer-disinfector and state what they aim to achieve:
- Flush = removes gross contamination
- Wash = removes biological matter
- Rinse = removes residue
- Thermal disinfection = 90/95 degrees for 1 min
- Drying = removes excess moisture
What should you do following cleaning and disinfection?
Inspect instruments using an illuminated magnifier to check for residual contamination and functionality of instruments (eg any damage or corrosion)
What PPE should be worn for manual cleaning of instruments?
- gloves
- heavy duty gloves
- apron
- face covering
What are the requirements for manual cleaning?
- With chemicals
- <35 degrees celsius
- Under surface of water
- Use soft bristled brush
What conditions should sterilizers reach?
- 134-137 degrees celsius for 3 minutes
- Pressure gauge 2.05-2.35 bar
- Pressure absolute 3.05-3.35 bar
Give examples of daily checks that should be carried out on sterilisers:
- check load carrier and chamber
- check door seal
- fill feed water reservoir
- drain used water reservoir
- record cycle information
What instruments can be processed in a Type B steriliser?
- wrapped instruments
- channeled and lumened items
What records should be kept for decon audit purposes?
- staff training records
- cycle date for traceability
- validation and testing reports
- asset register with maintenance intervals
- faults, failures and diagnostics