250VDC Battery is sized to ensure how many hours during a Loss of Offsite Power (LOOP)?
3 Hrs
250VDC Battery is sized to ensure how many hours during a Station Blackout (SBO)?
4 Hrs
If one of the two ground detection lights goes out, which one indicates the ground?
The one that is not lit indicates ground (Could be dimmer than the other as well)
Which 250V DC battery has more capacity than the others and why?
U1 CD Battery, because it has additional loads on it (WDS, Drumming Room, MUP, etc)
Where do the BOP battery Chargers get their power from?
600 V BMC/CMC
What is the 250V DC BOP Battery sized for?
2 hrs for Loss of Offsite Power (LOOP)
What load does not strip off the BOP battery? WHY?
Emergency Seal Oil pump to prevent H2 from leaking out of generator (explosion hazard)
If a battery is supplying loads without a charger connected, and the equipment loaded on battery does not change, what will happen to current draw (amps) as the battery is expended (voltage lowers)?
Rise steadily until the design battery capacity is exhausted
CR Lights are powered by which ABT(s)?
ABT 1 and 2
What are ABT’s 1, 2, 3, & 5 normally powered from for both units?
11A South Lighting Transformer
21D North Lighting Transformer
What are ABT’s 1, 2, 3, & 5 back up power supplies for both units are?
11/21C Standby Lighting Transformer
What is the TSC-UPS Battery Charger’s normal power supply?
11C
If the CRID Normal Source is OOS, is the CRID Inverter and/or the CRID Bus Inop?
CRID Inverter is Inop, but the CRID Bus is Operable
If the CRID Bus is powered by CRP-3, is the CRID Bus considered Operable or Inoperable?
CRID Bus is Inoperable when it is powered from CRP-3
Per 3.8.8 - Inverters Shutdown, If CRID 1 and 2 inverters are powered from their alternate power source with CRID 3 distribution powered from CRP-3 in Mode 5, is an entry into a Technical Specifications LCO required?
YES, OPERABILITY of the inverters requires that the 120 VAC vital bus be powered by the inverter. CRP-3 powers the CRID directly.
IMMEDIATELY Suspend core alterations, suspend fuel movement activities, do not reduce SDM or Boron concentration, initiate action to restore to operable